The following are deliverables produced by the Architect:
Respuesta
  • Conceptual Mass Model
  • Preliminary Design Coordination Report between Architecture model & Structural model
  • Clash detection & resolution report between Architecture, Structure & MEP models
  • RFI Resolutions
  • All of the above

Pregunta 2

Pregunta
Current BIM implementation is still based on a Hybrid method
Respuesta
  • True
  • False

Pregunta 3

Pregunta
To generate the topography model, the Architect will use topography drawings of the existing site, provided by the Registered Surveyor / Civil Engineers
Respuesta
  • True
  • False

Pregunta 4

Pregunta
During Schematic design phase, the Architect do not produce
Respuesta
  • Layout plans 1:200 scale
  • Outline structural and mechanical design
  • Fabrication details
  • Generic wall / window / door 
components

Pregunta 5

Pregunta
During Detail Design phase, the Architect would produce:
Respuesta
  • Layout plans showing layer construction 1:100 – 1:50 scale
  • 
Produce 1:20 – 1:5 detail drawings 

  • Construction sequencing

Pregunta 6

Pregunta
During Details Design phase, Model Exchange is done continuously as the design and project progresses. Early clash detections are performed to lessen conflict of elements before construction.
Respuesta
  • True
  • False

Pregunta 7

Pregunta
When continue and develop Architecture model to Contractor’s model, basic elements required from the Architecture model are:
Respuesta
  • X, Y, Z Coordinates 

  • Topography (Existing Site Model) 
 

  • Topography (Proposed Site Model) 

  • Grid and Level 

  • Building components: Wall, Architectural Column, Door, Window, Slab/ Floor, Ceiling, Fixtures, Furniture (optional), Facade, Railing, etc.
Mostrar resumen completo Ocultar resumen completo

Similar

Inglés - Vocabulario Básico
maya velasquez
PRUEBAS DE CONCENTRACIÓN YDILUCIÓN URINARIAS
gncd.26
PASAPALABRA  sobre  ANATOMÍA
JL Cadenas
Sistema Internacional de Unidades (SI)
Raúl Fox
Ingeniería Industrial
monicasorelly14
Alemán Básico
Virginia León
LAS PLANTAS
Red Mist
FGM-11. DERECHOS Y DEBERES DE LOS MIEMBROS DE LAS FUERZAS ARMADAS
antonio del valle
LA INDEPENDENCIA DE ESTADOS UNIDOS
ROSA MARIA ARRIAGA
Formación Cívica y Ética
Karina Tobias
Mis MAPAS MENTALES...
Ulises Yo