Current BIM implementation is still based on a Hybrid method
Respuesta
True
False
Pregunta 3
Pregunta
To generate the topography model, the Architect will use topography drawings of the existing site, provided by the Registered Surveyor / Civil Engineers
Respuesta
True
False
Pregunta 4
Pregunta
During Schematic design phase, the Architect do not produce
Respuesta
Layout plans 1:200 scale
Outline structural and mechanical design
Fabrication details
Generic wall / window / door components
Pregunta 5
Pregunta
During Detail Design phase, the Architect would produce:
Respuesta
Layout plans showing layer construction 1:100 – 1:50 scale
Produce 1:20 – 1:5 detail drawings
Construction sequencing
Pregunta 6
Pregunta
During Details Design phase, Model Exchange is done continuously as the design and project progresses. Early clash detections are performed to lessen conflict of elements before construction.
Respuesta
True
False
Pregunta 7
Pregunta
When continue and develop Architecture model to Contractor’s model, basic elements required from the Architecture model are:
Respuesta
X, Y, Z Coordinates
Topography (Existing Site Model)
Topography (Proposed Site Model)
Grid and Level
Building components: Wall, Architectural Column, Door, Window, Slab/ Floor, Ceiling, Fixtures, Furniture (optional), Facade, Railing, etc.