Intake7 BIM P3L3B

Descripción

Test sobre Intake7 BIM P3L3B, creado por Stanley Chia el 13/03/2017.
Stanley Chia
Test por Stanley Chia, actualizado hace más de 1 año
Stanley Chia
Creado por Stanley Chia hace casi 8 años
195
1

Resumen del Recurso

Pregunta 1

Pregunta
The Guide used for starting BIM in an organisation is
Respuesta
  • BIM Essential Guide for Adoption in BIM
  • BIM Essential Guide for Execution Plan
  • BIM Essential Guide for Contractors
  • BIM Essential Guide for Building Performance Analysis

Pregunta 2

Pregunta
The BIM Committee should
Respuesta
  • Be chaired by a senior leader
  • Meet once every six months
  • Involves representatives from various levels
  • Roles and responsibilities of each member should be defined

Pregunta 3

Pregunta
BIM Process for Project should be included in the organisation BIM adoption plan:
Respuesta
  • True
  • False

Pregunta 4

Pregunta
The competency map and training roadmap should be included in the BIM adoption plan?
Respuesta
  • True
  • False
Mostrar resumen completo Ocultar resumen completo

Similar

DIAS DE LA SEMANA, MESES Y ESTACIONES EN INGLES
Montse Lafuente Benito
Hematología - ENARM
Emilio Alonsooo
Test sobre Miguel de Unamuno
crisferroeldeluna
Cristobal Colón - El Nuevo Mundo
Diego Santos
CCNN 5EP. Tema 6. Aparato locomotor
JOSÉ ALBERTO VERDUGO GARCÍA
Marketing Digital
Diego Santos
Pequeños Trucos para Leer Más en Menos Tiempo
Diego Santos
TRIBUNALES DE JURADO
juanbanogranell
CUADRO SINOPTICO
gnatalia_1296
Test de Ecuaciones Bicuadradas
MANUEL LUIS PÉREZ SALAZAR