Creado por Kevin Muncie
hace casi 7 años
|
||
Pregunta | Respuesta |
Verification | Deals with processes that ensure the software is being built correctly |
Validation | Deals with processes that ensure that the correct software is being built |
Static V&V | Deals with software inspections |
Dynamic V&V | This deals with software testing |
IV&V characteristics | 1 Includes Risk identification and Mitigation techniques 2 Provides Independent evaluation 3 Requires technical managerial and financial independence 4 Makes a value added contribution, everyone shares the same mission success objective |
Iv&V and the SDLC | Concept phase Requirements phase Design phase Coding phase Test phase Operational phase |
IV&V Benefits | Better software/performance Higher confidence in software reliability Compliance between specs and code Criteria for program acceptance Better visibility into development Better decision criteria Second source technical alternative Reduced maintenance cost Reduced frequency of operational change |
¿Quieres crear tus propias Fichas gratiscon GoConqr? Más información.