Jubilee River - Case Study

Descripción

Fichas sobre Jubilee River - Case Study, creado por Tom .. el 12/04/2018.
Tom ..
Fichas por Tom .., actualizado hace más de 1 año
Tom ..
Creado por Tom .. hace más de 6 años
106
1

Resumen del Recurso

Pregunta Respuesta
Location Relief channel for River Thames in south-east England
Cost £330 million
Opened 2002
Weirs? 5
Reduces risk Maidenhead, Eton and Windsor
Why was it required Thames flood plain - low Protect Windsor Urbanisation caused flooding High property value Take overflow water
Issues - Social Some places have gained, less wealthy settlements have resulted in a higher flood risk
Issues - Economic Most expensive scheme, but after 1 year, weirs were damaged Small businesses will loose money
Issues - Environmental 2014 flooding downstream - fields were damaged and habitats disturbed Concrete weirs are ugly and algae collected behind them
Mostrar resumen completo Ocultar resumen completo

Similar

PROCESADORES DE TEXTO
rm-asociados
Campo magnético
Diego Santos
ESTILOS DE ARQUITECTURA
andres silva a
Musculos de brazo y antebrazo
Laura Bonilla
Funciones Esenciales de la salud Pública
Bere Segovia
Miguel de Cervantes Saavedra
Israel Morales
TIC APLICADA A LA EDUCACIÓN INICIAL
rosita_20_13
Test de Ecuaciones Factorizadas
MANUEL LUIS PÉREZ SALAZAR
MAPA MENTAL - BASES EPISTEMOLÓGICAS
Víctor Giovanny Alvarez Gómez