Jubilee River - Case Study

Descripción

Fichas sobre Jubilee River - Case Study, creado por Tom .. el 12/04/2018.
Tom ..
Fichas por Tom .., actualizado hace más de 1 año
Tom ..
Creado por Tom .. hace más de 6 años
106
1

Resumen del Recurso

Pregunta Respuesta
Location Relief channel for River Thames in south-east England
Cost £330 million
Opened 2002
Weirs? 5
Reduces risk Maidenhead, Eton and Windsor
Why was it required Thames flood plain - low Protect Windsor Urbanisation caused flooding High property value Take overflow water
Issues - Social Some places have gained, less wealthy settlements have resulted in a higher flood risk
Issues - Economic Most expensive scheme, but after 1 year, weirs were damaged Small businesses will loose money
Issues - Environmental 2014 flooding downstream - fields were damaged and habitats disturbed Concrete weirs are ugly and algae collected behind them
Mostrar resumen completo Ocultar resumen completo

Similar

ExamTime
maya velasquez
La Escala Musical
mariajesus camino
Test Cuerpos Geométricos
Ruth Pérez Sánchez
Esquema del reformismo ilustrado en España
maya velasquez
Mapa Conceptual
Laura Laguna
Fomentando la Creatividad en el Aula
Diego Santos
Huesos del esqueleto humano
mariana ligonio
Test: The Passive voice
wendygil_22
TÁCTICA 1.1 HISTORIA Y TRADICIONES
antonio del valle
Ejercicios de ortografía urgente: echo, echa, hecho, hecha
Iván Jiménez
COSTAS E RÍOS
Nuria Prado Álvarez