Perform earned value calculations

Descripción

7.15a perform earned value calculations.
Althea Green
Fichas por Althea Green, actualizado hace más de 1 año
Althea Green
Creado por Althea Green hace casi 8 años
15
0

Resumen del Recurso

Pregunta Respuesta
What is earned value? The value of completed worked expressed in terms of the budget assigned to that work. A measure of progress which may be expressed in cost or labour terms.
How can earned value be used in projects? Understand true nature of project performance. Indicate what might be going wrong. Predict where the final project cost and end date if progress continues unchanged.
What is earned value management? The proactive management of the project performance using earned value as a key input.
Define & describe the terms used in earned value calculations. (part 1) ATE = Actual time expended (the time now) EV = Earned value (see above) PC = Planned cost (rate of project spend) AC = Actual cost (costs incurred up to ATE) BAC = Budget at completion (of either individual work package or all work packages combined)
Define & describe the terms used in earned value calculations. (part 2) EAC = Estimate at completion (cost at project end date) Planned completion = original end date Actual completion = predicted end date CV = Cost variance SV = Schedule variance CPI = Cost Performance Index SPI = Schedule Performance Index
List the 7 earned value calculations. EV = BAC x % complete EAC = BAC / CPI Actual completion = planned comp. / SPI CV = EV - AC SV = EV - PC CPI = EV / AC SPV = EV / PC
What is the basis for earned value calculations? The planned cost curve
What are the steps in calculating earned value? (part 1 - steps 1 to 4) 1. BAC data for each work package & it's duration displayed in a table (p.213). 2. On the planned cost curve mark the: - ATE, BAC, planned completion & total AC 3. Calculate the EV for the work packages & add to the table. 4. Plot the total EV on the planned cost curve.
What are the steps in calculating earned value? (part 2 - steps 5 to 7) 5. Calculate the CV, SV, CPI, SPI and EAC. 6. Extend the axis's on the planned cost curve if necessary and plot these calculated values. 7. The EV never exceeds the original BAC but will be achieved at new actual completion date.
What do the CV, SV, SPI and CPI calculations mean? A negative cost variance (CV) or schedule variance (SV) is bad. A Schedule Performance Index (SPI) or Cost Performance Index (CPI) of less than 1 is bad. CPI & SPI show cost & schedule effeciency (running at less than 100% is inefficient).
Mostrar resumen completo Ocultar resumen completo

Similar

Chino Mandarín Básico
Diego Santos
Estrategias de Enseñanza Alternativas
Diego Santos
CIUDADES I...
JL Cadenas
FARMACOLOGÍA DE LA MUSCULATURA ESQUELETICA
cass_baltazar
Romanticismo literario del S. XIX
maya velasquez
Mi Entorno Personal de Aprendizaje (PLE)
Martín López Barrientos
Poniendo en Práctica el Aprendizaje Basado en Problemas
Diego Santos
Cómo Aprender Idiomas Usando Fichas
Diego Santos
ESTRUCTURAS Y FUNCIONES DEL SISTEMA NERVIOSO
Paola Andrea Joya Ramirez
lipidos laboratorio biologia
Miguel Angel Espinosa
HOW TO WAKE UP EARLY
Elaine del Valle