Programme management & strategic change

Descripción

3.3 outline the characteristics of programme management and its relationship with strategic change
Althea Green
Fichas por Althea Green, actualizado hace más de 1 año
Althea Green
Creado por Althea Green hace más de 8 años
131
1

Resumen del Recurso

Pregunta Respuesta
What is programme management? (part 1) Coordination of multiple projects and change management activities. Interaction with business-as-usual. Transition to BAU must be well organised. Clear visibility of transition issues.
What is programme management? (part 2) Directed by the overall programme objectives. Focused on achievement of strategic objectives. A team containing specialists drawn from the business, i.e. HR team (large projects only).
How are programmes linked to strategic change? Individual projects must be linked to ensure consistency and collective management. Driven by vision set by senior management Flexible and evolutionary as outcomes uncertain and objectives change. Programme deliverables are strategic. Benefits focused.
Mostrar resumen completo Ocultar resumen completo

Similar

Verbos Culinarios Inglés-Español
Diego Santos
Test para Practicar para el TOEFL
Lolo Reyes
Fichas de Grandes Filósofos
maya velasquez
Clasificación de estrategias didácticas
Karolaim Gutiérr
Animales vertebrados: clasificación y características
Reyna Isabel Mayorga
PRESENT CONTINUOS
fapn
Ciclo Celular
valentina marchant
constitucion de una empresa
isabel escobar
ESTRUCTURAS REPETITIVAS O CICLICAS EN PROGRAMACION
Karla Moreno
Unidad 3: Fase 4 - Análisis de Sistemas de Manufactura
Julio Cesar Hernández Giraldo
CALCULO INTEGRAL
Jazlen G.A