Creado por Joshua Vance
hace alrededor de 8 años
|
||
Pregunta | Respuesta |
Who may consider and approve alternative procedures, methods or equipment standards to be used by a bulk liquid transfer facility operator? | COTP |
The operator of a bulk liquid transfer facility must submit an LOI to the COTP not less than _____ before intended operations. | 60 days |
How many copies of the operations manual must be submitted? | 2 |
If the operations manual meets the requirements, the COTP will return one copy of the manual marked _____. | Examined by the Coast Guard |
If the COTP requires changes to the operations manual, the facility operator has _____ to submit the amendments. | 45 days |
The operator of a bulk liquid transfer facility must submit the operations manual not less than _____ prior to any transfer. | 60 days |
If a bulk liquid transfer facility is in caretaker status, the operator must submit the operations manual not less than _____ prior to any transfer. | 30 days |
The minimum design burst pressure for each hose assembly must be at least _____ times the pressure of the relief valve plus the static head pressure. | 4 |
Each mechanical loading arm placed in service after June 30, 1973 must meet the requirements in ANSI _____. | B31.3 |
What size discharge containment is required for hoses/loading arms of 6-inch diameter or smaller? | 2 barrels |
What size discharge containment is required for hoses/loading arms more than 6-inches but less than 12-inches in diameter? | 3 barrels |
What size discharge containment is required for hoses/loading arms more than 12-inches in diameter or greater? | 4 barrels |
What size discharge containment is required for a mobile facility? | 5 gallons |
Each facility must have a means to safely remove discharged oil or hazardous materials within _____ of completion of the transfer. | 1 hour |
A facility that first transferred oil on or before November 1, 1980 must have a means to shutdown the flow within _____. | 60 seconds |
A facility that first transferred oil after November 1, 1980 must have a means to shutdown the flow within _____. | 30 seconds |
A facility that first transferred hazardous materials before October 4, 1990 must have a means to shutdown the flow within _____. | 60 seconds |
A facility that first transferred hazardous materials on or after October 4, 1990 must have a means to shutdown the flow within _____. | 30 seconds |
Illumination at transfer connection points must measure _____ foot candle(s). | 5.0 |
Illumination in transfer operation work areas must measure _____ foot candle(s). | 1.0 |
The person in charge of transfer operations is required to have at least _____ of experience. | 48 hours |
Hot work is prohibited during gas freeing operations within _____ of bulk cargo operations involving flammable materials. | 30.5 meters (100 feet) |
Hot work is prohibited during gas freeing operations within _____ of other hazardous materials. | 15.25 meters (50 feet) |
Records of examinations of the facility by the COTP shall be maintained for _____. | 3 years |
What subpart contains the Facility Response Plan requirements? | 33 CFR 154 Subpart F |
Qualified individual notification exercises must be performed _____. | quarterly |
How often must a spill management exercise be conducted? | Annually |
How often must facility owned equipment deployment exercises be conducted? | Semi-annually |
How often must OSRO owned equipment deployment exercises be conducted? | Annually |
A worst case discharge exercise must be conducted at least once every _____. | 3 years |
The facility operator shall ensure that records of all required exercises are maintained at the facility for _____. | 3 years |
Inspection and maintenance records must be maintained for _____. | 3 years |
How many copies of the facility response plan is required to be submitted to the COTP? | 1 |
How long is the facility response plan valid for? | 5 years |
A facility owner/operator must review his or her response plan(s) _____. | Annually |
¿Quieres crear tus propias Fichas gratiscon GoConqr? Más información.