Variable Cost per unit (Highest Cost - Lowest Cost)/(Highest Activity - Lowest Activity)
Hi Low Method Total cost = Fixed cost - (variable cost x activity)
Cost per unit Total Cost/Activity
Flexed Budget (Original budgeted activity/Original budgeted cost) x new activity
Revenue units sold x sales price
Profit Revenue - cost
Economic Order Quantity √2 x (cost of ordering x annual demand)/cost of holding one unit for one year
Reorder Level maximum demand x maximum lead time
Reorder Level with buffer (Maximum demand x maximum lead time) + buffer
Minimum Inventory Level Reorder level - (average demand x average lead time)
Maximum Inventory level Reorder Level + EOQ - (minimum demand x minimum lead time)
Overtime Premium (Basic pay x multiplier) - Basic pay
Direct Costs Prime costs
Overhead Absorption Rate Budgeted Costs/Budgeted activity
Marginal Costing Only uses variable costs
Unit Contribution Sales - variable cost
Cost c/f to next period Inventory x OAR
Difference in profit absorption and marginal costing Inventory movement x OAR
SIAM Stock increasing mean absorption will have more profit
Contribution Revenue - variable cost
Breakeven point in Units fixed costs/contribution
Breakeven in Revenue Breakeven point in units x selling price
Target Units (Fixed costs + target profit)/unit contribution
Margin of safety in units Budgeted or actual sales - breakeven sales volumes
Margin of safety as a % (Margin of safety in units/budgeted actual sales) x 100
Profit to Volume/ Contribution to sales ratio in units (Unit contribution/ unit price) x 100
Profit to Volume/ Contribution to sales ratio in % (Total Contribution/Total Revenue) x100
Target Revenue (Fixed costs + Target Profits)/ contribution to sales ratio
Limiting Factors Step 1 Amount needed = (cost of materials/price per unit) x demand
Limiting Factors Step 2 Calculate unit contribution for each product (Revenue - variable cost)
Limiting Factors Step 3 Contribution/ Limiting Factor
Limiting Factors Step 4 Rank the Products by amount of contribution the have make the one with the most contribution first
Limiting Factors Step 5 Production Schedule Cap of materials show how much you can make of each product before you run out of material in order of rankings
Payback Period Internal Rate of Return a% + (npv a/(npv a – npv b)) x (b% - a%)
NPV Net Present Value
Process Costing Step 1 Unit Calculation compare what was put in to the process to what came out (in whole pounds)
Process Costing Step 2 Update the process account with available information Materials in on the left Materials out on the right MUST BALANCE
Process Costing Step 3 Calculate the unit cost of output (Cost of input - normal loss value)/ (input units - normal loss units) in pound and pence
Process Costing Step 4 Complete the process account to include normal loss coming out of the process
Mostrar resumen completo Ocultar resumen completo

Similar

Chino Mandarín Básico
Diego Santos
Historia Argentina
Nicolas Ñancucheo
Cristobal Colón - El Nuevo Mundo
Diego Santos
Anatomía Humana
dorydan01
MATEMÁTICAS: ARITMÉTICA...
Ulises Yo
Repaso Romano
Lina Arevalo
FGM-12. MANIFESTACIONES EXTERNAS DE LA DISCIPLINA
antonio del valle
Ciclo de vida de un producto
Mariana Jaqueline Perez Navarro
Preguntas abiertas La Segunda República
Salustiano Gutiérrez Baena
Paso 2 - Planificación
lucenith rosado
U1_Ac4: Mapa Mental Medidas de tendencia central
Ana Karen Guevara Morales