Cohora Bassa Dam Case Study
Descripción
Case study on Cahora Basa Dam Mozambique
Sin etiquetas
world development
world development
a level
Mapa Mental por
Will Turner
, actualizado hace más de 1 año
Más
Menos
Creado por
Will Turner
hace alrededor de 10 años
20
0
0
Resumen del Recurso
Cohora Bassa Dam Case Study
On the Zambizie River, Mozambique
52% below poverty line
Low life expectancy (52 years)
The original plan for the dam
Generate HEP for rural areas of Mozambique
Sell excess generated power
A source of sustainable and renewable energy
Reduce risk of occasional flooding
In 1978 flood, 45 people died, 100,000 displaced, $62mil of damage
TECHNOCENTRIC AND TOP DOWN
No local community involvement, all decisions made by governments (mainly Portugal)
Mozambique elisted S.Africa to build the complicated transmission system of part of the dam, as well as a lot of the whole dam itself
On condition that it supplied S.Africa with energy
Funded by Portugal through BILATERAL AID
Portugal had to own 82% of the dam
(Portugal made most of the profits)
in 1975 Portugal sold Mozambique back the majority of the dam, but keeping 15%
Made $2.2 billion from this sale
Success?
Due to climate (drought) there are high levels of evaporation in the reservoir giving high levels of salinity
Led to a decline in the Shrimp industry
However other fisheries developed, as large colonies of Kapenta fish thrive behind the dam
10,000 tonnes as of 2003
A flood in 2013 killed 73 and displaced 10,000
Lack of fine alluvium deposits further downstream as blocked by dams
Less fertile soils impacting on farmers and food supply
Rare species of Bull Shark trapped behind dam in high salinity conditions
Civil war and insurgent attacks delayed the building of the dam
Estimated to have cost $3.8billion
Due to slow river velocity and low levels of rainfall the dam only provides 1% of its energy to rural areas
Most of the energy produced was sold to S.Africa to aid in its development, specifically during the 2010 world cup
Mostrar resumen completo
Ocultar resumen completo
¿Quieres crear tus propios
Mapas Mentales
gratis
con GoConqr?
Más información
.
Similar
Food Security
Keri Thomas
World Development Mind Map
sneha_123
World Development Quiz
I.G. Wilson
WaterAid
Will Turner
Urban solutions
Daisy Jones
FGM
Georgina Warner
Population theories - Resources relationships
Azra Kucukkaramu
Definitions
stephaniemsc
Mobile phones in Africa case study
stephaniemsc
1.4 competing claims on resources
Eliza_brainbox
Aral sea
Daisy Jones
Explorar la Librería