this process is used to identify and gather all risks and there nature, which could impact the project. All of these risks are entered on to the risk register which includes the name of each risk, its cause(s), and the responses to each risk that can be identified at this point of time.
Create short list of
risks
Nota:
(Througt qualitative and
optional quantitative risk
analysis)
Avoid or Exploit
Accept Actively
Reduce probability
and impacts of
threats, increase
probability and
impact of
opportunities
Identify
residual and
secundary
risks
Develop
contingency
plan reserves
Develop
fallback
plans
Identify
residual
and
secondary
risks
Go back and
perform
iterations and
update project
management
plan and
project
documents