This organization and comunication tool shows all the scope on the project,
broken down into manageable deliverables
Nota:
IS NOT A: List of thing to do
the WBS is created whith input from the team and
stakeholders
Nota:
using brain storming and/or method delphi
The project name goes at the top of the WBS, the next level
is typically the same as the project life cycle. The later levels
break the project into smallers pieces. Such decomposition
continues until reaching the level approriate to manage the
project