null
US
Iniciar Sesión
Regístrate Gratis
Registro
Hemos detectado que no tienes habilitado Javascript en tu navegador. La naturaleza dinámica de nuestro sitio requiere que Javascript esté habilitado para un funcionamiento adecuado. Por favor lee nuestros
términos y condiciones
para más información.
Siguiente
Copiar y Editar
¡Debes iniciar sesión para completar esta acción!
Regístrate gratis
45586
Quality Frameworks
Descripción
Eng Large Software Systems Mapa Mental sobre Quality Frameworks, creado por cheekymonky52 el 14/04/2013.
Sin etiquetas
eng large software systems
eng large software systems
Mapa Mental por
cheekymonky52
, actualizado hace más de 1 año
Más
Menos
Creado por
cheekymonky52
hace más de 11 años
47
0
0
Resumen del Recurso
Quality Frameworks
Six Sigma
Uses statistics to measure the number of defects
Aims to improve the design of processes in order to reduce number of defects
DMAIC and DMADV are two methods that can be followed to improve current processes in order to reduce number of defects
For a company to declare themselves as being six sigma they must produce no more than 3.4 defects per million
Six sigma is the variation away from the mean which is seen as perfection i.e. no defect produced
Not used as much today
Software processes depend on human behaviour which is not predicatble
Software Characteristics are not easily measured quantitavely
Capability Maturity Model
Used to help refine and develop software processes
Describes a five level evolutionary path that processes go through
Each level the process become more optimal and organised
1. Initial
2. Repeatable
3. Defined
4. Managed
5. Optimisation
Data collected is analysed and improvement is fed back into process
Processes are measured quantatively
Therefore success of processes can be predicted quantitavely
Need process control
Standard software process is defined and documented
Successes are consistent
Need process management
Success of processes can be predicted qualitatively
Basic project management techniques have been established
Need to define a standard process
Ad-Hoc
Disorganised
Project is not managed or documented
Need to establish basic management control
Mostrar resumen completo
Ocultar resumen completo
¿Quieres crear tus propios
Mapas Mentales
gratis
con GoConqr?
Más información
.
Similar
Testing Strategies
cheekymonky52
Testing Levels
cheekymonky52
Eng Large Software Systems
cheekymonky52
Best Practices
cheekymonky52
Modelling[1]
cheekymonky52
Architecture
cheekymonky52
1. Identify Risks
cheekymonky52
Modelling[2]
cheekymonky52
PMP Prep
jorgeat
PRIMERA AUTORIDAD RESPONDIENTE
jhovanymunoz
Termodinámica
Polett Quiñones
Explorar la Librería