  1. Project Management Plan
    1. Scope Baseline
    2. Project Charter
      1. High-Level Milestones
      2. EEF´s
        1. Culture, PMIS
        2. OPA´s
          1. Templates, Learned Lessons
          2. Plan Schedule Management
            1. SCHEDULE MANAGEMENT PLAN
              1. Includes: Scheduling Methodology and Scheduling SW to be used. Rules for how estimates should be stated. Establishment of a Schedule Baseline.Identification of the performance meausures. Determination of acceptable variance. How Schedule variances will be identified and managed. Identification of Schedule Change Control Procedures. Reporting Formats to be used.
              2. Define the processes to plan & control the schedule
              3. Define Activities
                1. List of all of the Activities that will need to be completed. It is the basis for the Network Diagram
                2. Sequence Activities
                  1. Figure out which activities need to come before others and put them in the right order.
                    1. Project Schedule Network Diagram
                    2. Estimate Activity Resources
                      1. Who and what are needed to get the project done.
                      2. Estimate Activity Durations
                        1. Time it will take to do each activity.
                        2. Develop Schedule
                          1. Build a Schedule from all of the estimates and the resource and activity information. It Predicts the Project End Date.
                          2. Control Schedule
                            1. Monitor and Control Changes to the Schedule to make sure that is kept up to date.
                            2. Tools: Expert Judgment, Analytical Techniques, Meetings.
                              1. How you will plan, manage and control the Project Schedule. Must be REALISTIC.
                                Mostrar resumen completo Ocultar resumen completo

                                Similar

                                Teorema de Pitágoras
                                josefa.h.122
                                Vocabulario unidad 13
                                Laura Maestro
                                Freud: Pasión Secreta
                                Cesar_Adolfo
                                CICLO CELULAR
                                Lesvin Depaz
                                Vocabulario Inglés (I y II) para la Selectividad
                                maya velasquez
                                Investigación
                                silvanoperazaiti
                                Properties of musical tones
                                Olga Veiga
                                CÁLCULO MENTAL...
                                Ulises Yo
                                PLAN DE ASESORÍA TÉCNICA PEDAGOGICA EN VERACRUZ
                                DIRECCIÓN GENERAL DE EDUCACIÓN FISICA FEDERALIZADA
                                CUADRO SINÓPTICO DE LOS TRASTORNOS DE LA PERSONALIDAD
                                yonaidy granados