I have to do if there is a change in project scope ?
variance analysis.
This tool is the difference analysis between the baseline and the actual work, serves to determine if
the plan needs to be corrected. If so, then recommended corrective action, and disseminate through
the recommendation a change control
The goal of Control
Scope is updating the
scope, plan, baseline,
and WBS info
This process will tell us if we are right or not, regarding the planned scope and if we are controlling
the changes that appear in the project