Abolish A - L stages and
replace with 7 point schedule
of works incorporating:
intellegent commissioning
soft landings
project outcomes
differing stages of planning
UK & international use
Private + public sector
Differing project sizes
KEY CHANGES
Work stages reduced from 11 to 7
& aligned with the CIC sch of
services
Stages A & B have been merged into 1 intitial 'preparation stage'
Stages F to L have been simplified and re-numbered
Job specific flexibility replaces the single description
of tasks used in the Plan of works 2007
Planning is accounted for in the design process
Sustainability and BIM have been incorporated with
the introduction of BIM 'overlay' and 'Green Overlay'
GREEN OVERLAY
Provides a framework for the inclusion of sustainability in the apprisal,
breifing, design and construction process.
the overlay takes the existing plan as a starting point add guidance notes and highlights
additional actions to promote the construction of sustainable buildings.