CM 434 Lean Construction

Descripción

Mapa Mental sobre CM 434 Lean Construction, creado por Ruben De Leon el 31/05/2017.
Ruben De Leon
Mapa Mental por Ruben De Leon, actualizado hace más de 1 año
Ruben De Leon
Creado por Ruben De Leon hace más de 7 años
100
0

Resumen del Recurso

CM 434 Lean Construction
  1. LEAN SUPPLY CHAIN MANAGEMENT
    1. Attributes Construction Supply Chain (
      1. Push vs Pull
        1. Push
          1. Materials released on pre-determined schedule
            1. , cost is increased inventory
            2. Pull
              1. Downstream stakeholders
                1. Release triggered by customer(s
                2. Pull w/Bulk Materials
                  1. Kanban
                    1. Customer withdraws from “supermarket
                      1. supermarket then gets replenished by issuing production Kanban; largely visual
                    2. No shop drawings
                      1. Prevents Over Production
                        1. Allows tightly bounded inventory to build up between supplier and customer process
                        2. Material purchased from uniformly produced lots
                          1. → Generally need to have some on-site inventory
                            1. Costs association
                        3. Pull w/ ETO Products
                          1. Requirements
                            1. Lead time
                              1. Look ahead window
                              2. Shop Drawings
                                1. Increase Look Ahead window
                                  1. Easier to perform
                                  2. Reduce Lead time
                            2. Product Types
                              1. Bulk
                                1. MTO
                                  1. ETO
                                  2. Construction Companies generally do not control supply chain
                                    1. Local optimization is limitation of construction
                                      1. Material MGMT Factors
                                        1. space, price, planning (demand) reliability, lead time
                                    2. LEAN DESIGN
                                      1. Pull in Design
                                        1. Target Value Design (TVD)
                                          1. Integrated Design (IDP)
                                            1. Choose-by-advantage (CBA)
                                            2. INTEGRATED PROJECT DELIVERY
                                              1. Attributes
                                                1. Integrate Project Delivery
                                                  1. GMP vs EMP
                                                    1. Contractual Methods for Sharing Pain/Gain
                                                    2. ACTIVITY-BASED COSTING
                                                      1. Two goals of ABC
                                                        1. Mechanisms
                                                          1. Cost Drivers
                                                          Mostrar resumen completo Ocultar resumen completo

                                                          Similar

                                                          Historia Contemporánea: Los fascismos
                                                          María Salinas
                                                          Modelo de Examen de Inglés - Selectividad
                                                          juanmadj
                                                          TEOREMA de PITÁGORAS
                                                          JL Cadenas
                                                          Disoluciones
                                                          Victor Rodriguez
                                                          Un Mundo de Posibilidades con las Fichas
                                                          Diego Santos
                                                          Diferencias entre la Química y Física
                                                          maya velasquez
                                                          Examen de informática básica
                                                          Cova M
                                                          01 - Contexto histórico del Renacimiento
                                                          Jesús Aguado Álvarez
                                                          Clasificación de las voces humanas
                                                          mariajesus camino
                                                          Choose the most suitable future form in each sentence
                                                          Margarita Beatriz Vicente Aparicio
                                                          USO DE HERRAMIENTAS DE DISEÑO AUTOCAD
                                                          mart cruzz