CM 434 Lean Construction

Descripción

Mapa Mental sobre CM 434 Lean Construction, creado por Ruben De Leon el 31/05/2017.
Ruben De Leon
Mapa Mental por Ruben De Leon, actualizado hace más de 1 año
Ruben De Leon
Creado por Ruben De Leon hace más de 7 años
103
0

Resumen del Recurso

CM 434 Lean Construction
  1. LEAN SUPPLY CHAIN MANAGEMENT
    1. Attributes Construction Supply Chain (
      1. Push vs Pull
        1. Push
          1. Materials released on pre-determined schedule
            1. , cost is increased inventory
            2. Pull
              1. Downstream stakeholders
                1. Release triggered by customer(s
                2. Pull w/Bulk Materials
                  1. Kanban
                    1. Customer withdraws from “supermarket
                      1. supermarket then gets replenished by issuing production Kanban; largely visual
                    2. No shop drawings
                      1. Prevents Over Production
                        1. Allows tightly bounded inventory to build up between supplier and customer process
                        2. Material purchased from uniformly produced lots
                          1. → Generally need to have some on-site inventory
                            1. Costs association
                        3. Pull w/ ETO Products
                          1. Requirements
                            1. Lead time
                              1. Look ahead window
                              2. Shop Drawings
                                1. Increase Look Ahead window
                                  1. Easier to perform
                                  2. Reduce Lead time
                            2. Product Types
                              1. Bulk
                                1. MTO
                                  1. ETO
                                  2. Construction Companies generally do not control supply chain
                                    1. Local optimization is limitation of construction
                                      1. Material MGMT Factors
                                        1. space, price, planning (demand) reliability, lead time
                                    2. LEAN DESIGN
                                      1. Pull in Design
                                        1. Target Value Design (TVD)
                                          1. Integrated Design (IDP)
                                            1. Choose-by-advantage (CBA)
                                            2. INTEGRATED PROJECT DELIVERY
                                              1. Attributes
                                                1. Integrate Project Delivery
                                                  1. GMP vs EMP
                                                    1. Contractual Methods for Sharing Pain/Gain
                                                    2. ACTIVITY-BASED COSTING
                                                      1. Two goals of ABC
                                                        1. Mechanisms
                                                          1. Cost Drivers
                                                          Mostrar resumen completo Ocultar resumen completo

                                                          Similar

                                                          La Ley de la Gravedad
                                                          maya velasquez
                                                          2. PROTEINAS
                                                          Vivi Riquero
                                                          Ecuaciones (Primer Grado)
                                                          Diego Santos
                                                          Goya (1746-1828)
                                                          Joaquín Ruiz Abellán
                                                          Test Asociado al Reading "Social Network"
                                                          Diego Santos
                                                          Test de Auxiliar de Enfermeria para repaso
                                                          leyvamiri
                                                          Aparato excretor
                                                          trabajobyg20
                                                          MAPA MENTAL ESTADISTICA
                                                          fidel451
                                                          Clasificación de variables
                                                          Rober Sanchez
                                                          Filosofías que Aplicar a tu Estudio para Obtener Mejores Resultados
                                                          Diego Santos
                                                          Sistemas del Cuerpo Humano
                                                          Diego Santos