1. Which of the following information is not required for an isometric drawing?
a. Location of building
b. Room dimensions
c. Positions of walls
d. Window specifications
2. Which of the following is a benefit of isometric drawings?
a. Provides a pictorial view of the finished product
b. Helps the customer understand what the product will look like
c. Provides a pictorial view of the design concept
d. All of the above
Which of the following is not required to produce isometric projection drawings?
a. Isometric axis
b. Customer details
c. Scale
d. Object dimensions
4. Which construction method is used to ensure heat loss is at a minimum?
a. Location of insulation
b. Selection of workforce
c. Following HASAWA 1974
d. Location of services
What does EPC stand for?
a. Energy Presence Critical
b. Energy Presence Certificate
c. Energy Performance Critical
d. Energy Performance Certificate
What insulation material is abbreviated to PIR?
a. Polyisurate
b. Polyisocyanurate
c. Polyisocyan
d. Polyisorate
What insulation material is abbreviated to EP?
a. Excellent polystyrene
b. Expanding polystyrene
c. Energy polystyrene
d. Expanded polystyrene
Which sustainable product is sourced by FSC?
a. Timber
b. Bricks
c. Stone
d. Cement