Muhammad Aqib
Test por , creado hace más de 1 año

Hell Aqib Test sobre Important (ADSE I), creado por Muhammad Aqib el 20/06/2019.

610
0
0
Muhammad Aqib
Creado por Muhammad Aqib hace alrededor de 5 años
Cerrar

Important (ADSE I)

Pregunta 1 de 40

1

Which of the following statement about composite structure diagram element are correct?

Selecciona una o más de las siguientes respuestas posibles:

  • Ports are modeled as small squares

  • Ports appears on the boundary of an object

  • Collaboration element is represented by a rectangle

  • Collaboration occurrences show instances of collaboration

Explicación

Pregunta 2 de 40

1

Which of the following statements are true about the Subsystem?

Selecciona una o más de las siguientes respuestas posibles:

  • Subsystems are smaller systems within a large system

  • A subsystem realizes one or more interfaces. Which define the behaviour it can perform

  • It may be represented as a UML packagcustosche or a set of operations

Explicación

Pregunta 3 de 40

1

Which of the following situation , aggregation may be appropriate?
1. An object is physically composed of other objects.
2. An object is logical collection of other object.
3. An object can physically contain other objects.

Selecciona una de las siguientes respuestas posibles:

  • 1,2

  • 2,3

  • 1,3

  • 1,2,3

Explicación

Pregunta 4 de 40

1

A_________ is represented as a task of zero duration showing an important achievement

Selecciona una de las siguientes respuestas posibles:

  • Milestone

  • Schedule

  • Project Phase

  • Tracker

Explicación

Pregunta 5 de 40

1

By default, MS Project 2010 accrues resource costs ______________

Selecciona una de las siguientes respuestas posibles:

  • On a prorated basis

  • At the start of the project

  • At the end of the project task

  • As soon as the specific task starts in the project

Explicación

Pregunta 6 de 40

1

In Ms project 2010, project managers can use the _________ field in the Resource sheet to designate resources with estimated rates or costs that update with actual rates as the project progresses

Selecciona una de las siguientes respuestas posibles:

  • Material

  • Code

  • Work

  • Resource

Explicación

Pregunta 7 de 40

1

By default, all tasks in MS Project are ____________

Selecciona una de las siguientes respuestas posibles:

  • Fixed units tasks

  • Fixed duration tasks

  • Fixed work tasks

Explicación

Pregunta 8 de 40

1

Increasing the number of resources of a task will __________ the duration and decreasing the resources will _________ the duration of the task

Selecciona una de las siguientes respuestas posibles:

  • Increase, Decreases

  • Decreases, Decreases

  • Decreases, Increase

  • Increase, Increase

Explicación

Pregunta 9 de 40

1

Which of the following task types MS Project dose not considered as effort – driven tasks by default?

Selecciona una o más de las siguientes respuestas posibles:

  • Fixed duration

  • Fixed work

  • Fixed units

  • Fixed time

Explicación

Pregunta 10 de 40

1

MS Project 2010 comes with a unique feature of saving a project baseline data up to _________ times during the project life cycle

Selecciona una de las siguientes respuestas posibles:

  • 6

  • 10

  • 11

  • 15

Explicación

Pregunta 11 de 40

1

Which of the following are elements of the custom groups?

Selecciona una o más de las siguientes respuestas posibles:

  • Field type

  • Field name

  • Order

  • Field group

Explicación

Pregunta 12 de 40

1

Which of the following leveling order delays or splits the task with the highest ID number in the project?

Selecciona una de las siguientes respuestas posibles:

  • Standard

  • ID only

  • Priority

  • Priority, Standard

Explicación

Pregunta 13 de 40

1

Which of the following tracking method is useful if managers want to present in their weekly status meeting. the work hours and costs put in during that week?

Selecciona una de las siguientes respuestas posibles:

  • Task-total

  • Task-time phased

  • Assignment-total

  • Assignment-timephased

Explicación

Pregunta 14 de 40

1

Cost performance is the difference between earned value and ____________

Selecciona una de las siguientes respuestas posibles:

  • Total value

  • Planned value

  • Actual cost

  • Project

Explicación

Pregunta 15 de 40

1

By default, Gantt Charts in MS Project following a _______ and________ color for the taskbars

Selecciona una o más de las siguientes respuestas posibles:

  • Green

  • Blue

  • Orange

  • Red

Explicación

Pregunta 16 de 40

1

___________ produces information reliably grounded in the observed behaviour of a system

Selecciona una de las siguientes respuestas posibles:

  • Walkthroughs

  • Verification

  • Validation

  • Testing

Explicación

Pregunta 17 de 40

1

________ produces value indirectly through information about valuable system behaviors.

Selecciona una de las siguientes respuestas posibles:

  • Testing

  • Walkthroughs

  • Validation

  • Verification

Explicación

Pregunta 18 de 40

1

Performing a test is a _________activity

Selecciona una de las siguientes respuestas posibles:

  • Physical

  • Logical

  • Technical

  • Non-technical

Explicación

Pregunta 19 de 40

1

Which of the statements about testing principles is true?

Selecciona una de las siguientes respuestas posibles:

  • Testing resources are limited

  • It is impossible to test everything

  • Testing is based on the design created.

  • Testing begins after the modules are integrated

Explicación

Pregunta 20 de 40

1

Testing is based on ___________

Selecciona una de las siguientes respuestas posibles:

  • Design team requirements

  • User requirements

  • Design outputs

  • Code developed

Explicación

Pregunta 21 de 40

1

Identify the measurement areas of Motorola Quality Policy for Software Development
(QPSD).

Selecciona una o más de las siguientes respuestas posibles:

  • Delivered defects and delivered defects per size

  • Total effectiveness throughout the process

  • Estimation accuracy

  • Decrease software defect density

Explicación

Pregunta 22 de 40

1

How can users enter the task information in the MS Project?

Selecciona una o más de las siguientes respuestas posibles:

  • Using the Gantt table

  • Importing tasks from Excel or Outlook

  • Importing tasks from Word document or project table

  • Using the Task information dialog box via the Gantt Chart view

Explicación

Pregunta 23 de 40

1

In which of the following situation, any two tasks can become a predecessor-successor pair?

Selecciona una o más de las siguientes respuestas posibles:

  • When they both auto scheduled.

  • When they have a timing relationship between them.

  • When they share resources between them.

  • One cannot Start before another finishes

Explicación

Pregunta 24 de 40

1

Which of the following diagram is a pictorial representation of a system’s functions? Functions from part of various processes that are executed for a system.

Selecciona una de las siguientes respuestas posibles:

  • Structured Analysis

  • Dataflow Diagram

  • Graph designing

Explicación

Pregunta 25 de 40

1

The project size can be measured by using the Program Complexity Method.

Selecciona una de las siguientes respuestas posibles:

  • True

  • False

Explicación

Pregunta 26 de 40

1

Which of the following helps us to find answers to questions related to data processing applications such as identifying the primary data object to be processed by the system, the composition of each data object and the attributes which describe the object?

Selecciona una de las siguientes respuestas posibles:

  • Data Modeling

  • System Elements

  • Data Object or Entities

Explicación

Pregunta 27 de 40

1

Attributes define the properties of a data object. It may serve which of the following purpose?

Selecciona una de las siguientes respuestas posibles:

  • Name an instance of the data object.

  • Describe the instance.

  • Make references to another instance in another table.

  • All of the above.

Explicación

Pregunta 28 de 40

1

Relationships can be bi-directional. Data object, attributes and relationships from the basic elements of data modelling and provide the basis for understanding the information domain of a problem.

Selecciona una de las siguientes respuestas posibles:

  • True

  • False

Explicación

Pregunta 29 de 40

1

__________ IS THE SPECIFICATION OF THE NUMBER OF OCCURRENCES OF ONE OBJECT THAT CAN BE RELATED TO NUMBER OF OCCURRENCES OF ANOTHER OBJECT.

Selecciona una de las siguientes respuestas posibles:

  • MODALITY

  • CARDINALITY

  • ENTITY

Explicación

Pregunta 30 de 40

1

The term __________ can be applied to a person, place ,thing ,object or event.

Selecciona una de las siguientes respuestas posibles:

  • Modality

  • Cardinality

  • Entity

Explicación

Pregunta 31 de 40

1

Bubbles within a Data Flow Diagram are used to represent data stores.

Selecciona una de las siguientes respuestas posibles:

  • True

  • False

Explicación

Pregunta 32 de 40

1

Which of the following is an organized listing of all data elements that are pertinent to the system with precise, rigorous, definitions so that both user and system analyst will have a common understanding of inputs, outputs ,components of stores and intermediate calculations?

Selecciona una de las siguientes respuestas posibles:

  • Control Flow

  • Data Dictionary

  • Cardinality

Explicación

Pregunta 33 de 40

1

An Entity- Relationship diagram identifies a number of components such as objects, attributes relationships and various type-indicators.

Selecciona una de las siguientes respuestas posibles:

  • True

  • False

Explicación

Pregunta 34 de 40

1

Which of the following defines the relationship among the major structural elements of the program?

Selecciona una de las siguientes respuestas posibles:

  • Component-level design

  • Interface design

  • Architectural design

Explicación

Pregunta 35 de 40

1

Which of the following describes how software communicates with system that interoperate within it and with people who use it?

Selecciona una de las siguientes respuestas posibles:

  • Component-level design

  • Interface design

  • Architectural design

Explicación

Pregunta 36 de 40

1

The _________ diagram is a form of activity diagram in which the nodes represent interaction diagram.

Selecciona una de las siguientes respuestas posibles:

  • Differential Overview

  • Interaction Overview

  • Partial Overview

  • Activity Overview

Explicación

Pregunta 37 de 40

1

The ________ diagram shows the internal structure of a class, component or collaboration, including its interaction points with other parts of the system.

Selecciona una de las siguientes respuestas posibles:

  • Complex Structure

  • Medium Internal

  • Composite Structure

  • Definition Structure

Explicación

Pregunta 38 de 40

1

The __________ diagram is composed only of packages and the dependencies between them

Selecciona una de las siguientes respuestas posibles:

  • Namespace

  • Activity

  • Package

  • Use-case

Explicación

Pregunta 39 de 40

1

Which of the following statements about the use-case model are correct?

Selecciona una o más de las siguientes respuestas posibles:

  • The Use-Case model only consists of actors.

  • The Use-Case model allows users to validate the fact that the system will become what they expect.

  • The Use-Case model only consist of use-cases.

  • The Use-Case model serves as a contract between customers, users, and system developers.

Explicación

Pregunta 40 de 40

1

Which of the following are types of project calendars in MS Project 2010?

Selecciona una o más de las siguientes respuestas posibles:

  • Basic Calendar

  • Standard Calendar

  • Task Calendar

  • Resource Calendar

Explicación