Creado por Kara Biczykowski
hace alrededor de 3 años
|
||
1) when consultants are used for a project, AIA Doc (__) is used:
2) this doc states the consultant is an:
3) it states for their portion of the project they must perform services w/:
4) it states all communication btwn consultant & owner, contractor, or oth consultants must go thru:
1) C401 also states the consultant is not responsible for:
CONSULTANT RESPONSIBILITIES
1) recommend to the arch the appropriate:
2) coord. their services w/ the:
3) prov. (__) to the arch & oth consultants as needed
4) prov. a (__) for the consultants work for the archs approval
CONSULTANT RESPONSIBILITIES
6) assist the arch in determining whether or not the arch will:
ARCHITECT RESPONSIBILITIES
1) the arch is reqd to prov. in a timely manner all of the:
2) ^ this includes:
1) example - the arch must provide the elec consultant w/ an itemized list of:
2) the arch is entitled to rely on the accuracy & completeness of:
3) the arch must inform consultants about:
1) although arch is responsible for ensuring the dwgs & specs conform to applicable codes, ea. consultant is responsible for code compliance in:
2) by signing their dwgs, engineering consultants become responsible for:
3) as the arch is the primary consultant they are liable to: