kim.t.dowling
Test por , creado hace más de 1 año

Diploma ASA380 - ASAP Implementation Methodology Test sobre ASAP 8 Methodology Test Management Work Stream Quiz , creado por kim.t.dowling el 16/03/2016.

51
1
0
kim.t.dowling
Creado por kim.t.dowling hace más de 8 años
Cerrar

ASAP 8 Methodology Test Management Work Stream Quiz

Pregunta 1 de 7

1

Which of the following are SAP Testing Tools?

Selecciona una o más de las siguientes respuestas posibles:

  • SAP Solution Manager Test Workbench.

  • SAP Quality Center by HP.

  • SAP Data Volume Management Cockpit

  • SAP Performance Stress Testing (SAP PST).

  • SAP Test Acceleration and Optimization (SAP TAO).

Explicación

Pregunta 2 de 7

1

Which of the following tasks are part of the Approved Technical System Test deliverable in the Final Preparation phase ?

(More than one answer is correct. Please choose the correct answers.)

Selecciona una o más de las siguientes respuestas posibles:

  • Final Integration test.

  • Execute Technical System Tests.

  • Going Live Check..

  • Test of the individual interface programs.

  • Obtain System Test Results Sign-off

Explicación

Pregunta 3 de 7

1

Which of the following statements about User Acceptance testing is true?

(More than one answer is correct. Please choose the correct answers.)

Selecciona una o más de las siguientes respuestas posibles:

  • The main objective of the Organisational Change Management work stream is to achieve a successful User acceptance testing.

  • The emphasis of User acceptance testing is to demonstrate that the system user roles and authorisations have been configured correctly.

  • User acceptance testing is the last test cycle of an SAP solution implementation, occurs at the end of the realisation phase subsequent to integration testing cycles and aims at ensuring that the system has been tested thoroughly by the project team and is ready to be released to the end-user community.

  • User acceptance testing means that all test cases have to be approved and signed by the key users for the related business processes.

  • User acceptance testing is the first test cycle of an SAP solution implementation, to make sure the users have the first say in how the user front end is designed.

Explicación

Pregunta 4 de 7

1

Testing is an integral part of building and deploying a fully functional and stable system in a timely manner. Which are the two general test categories that need to be addressed?

(One answer)

Selecciona una o más de las siguientes respuestas posibles:

  • Unit Testing and Integration Testing

  • Business Process Testing and Business Scenario Testing

  • Functional Testing and Data Load Testing

  • Functional Testing and Performance Testing

  • Business Process Testing and Performance Testing

Explicación

Pregunta 5 de 7

1

Which are testing-focusing accelerators provided in ASAP?

(More than one answer is correct. Please choose the correct answers.)

Selecciona una o más de las siguientes respuestas posibles:

  • Test Case Template

  • Functional Testing Close Template

  • Functional Specification Template

  • Final Configuration Plan

  • Performance Test Plan Template

Explicación

Pregunta 6 de 7

1

Which of the following test types is performed in the production environment?

(One answer)

Selecciona una o más de las siguientes respuestas posibles:

  • Functional testing

  • Regression testing

  • Performance testing

  • Data Conversion simulation

Explicación

Pregunta 7 de 7

1

In Realisation, during baseline and final configuration, the project team needs to test chains of transactions that represent business processes and scenarios. What do you call the test that is focused on multiple transactions within one defined business scenario?

Selecciona una o más de las siguientes respuestas posibles:

  • Regression Test

  • Performance Test

  • Stress Test

  • String Test

Explicación