What is programming?
1-2
According to the book Problem Seeking by William Pena, et al., what
are the five steps in the programming process?
1-3
How does a programmatic concept differ from a design concept?
1-4
In terms of the programming process, what are the three components
of flexibility?
1-5
What four types of information should be included in every
programming document?
1-6
What is ergonomics?
1-7
What is anthropometrics?
1-8
In what three ways does the human body lose heat?
1-9
What is the mean radiant temperature?
1-10
What is territoriality?
1-11 What is proxemics?
1-12 In proxemics, as described by Edward T. Hall, what are the names of
the four distances (starting with the closest)?
1-13 What theory did Abraham
Maslow propose?
1-14 Which of the table and seating configurations shown here is most
appropriate for a committee meeting
1-15 What voluntary, consensus-based national standard for developing
high-performance, sustainable buildings was established by the
USGBC?
1-16 What are the four possible ratings for the LEED certified project
(highest to lowest)?
1-17 What is sustainable design?
1-18 In terms of the programming process, what are three limitations of
behavior observation as a technique for gathering information?
1-19 What four methods of gathering information are used in the
programming process?
1-20 What are some authoritative sources for product information?
1-21 What consultant is responsible for designing new openings in the
floor of an existing building?
1-22 What is a common way to determine the floor area required for an
activity?
1-23 What range of percentages do space-planning efficiency ratios
typically fall within?
1-24 What is the net area or net assignable area of a building?
1-25 In a leased space, what is considered to be rentable area?
1-26 In a leased space, what is considered to be usable area?
1-27 What is the efficiency factor of a leased space?
1-28 What type of workflow is represented by this diagram?
1-29 What two things must a designer know about a space before the
necessary number of exits can be determined?
1-30 Which consultant must assist the interior designer when a project
requires the installation of heavy equipment?
1-31 Who may design a building’s sprinkler system?
1-32 What client-approved document should be available to the designer
before the schematic design process begins?