Creado por aleaguirre
hace más de 11 años
|
||
Change Management System
Change Control Board
(CCB)
Traditional Systems Development Lifecycle (SDLC)
Prototype
Four Step Process of Prototyping
End User Development
Purchasing Solutions
onshore outsourcing
nearshore outsourcing
offshore outsourcing
Rapid Application Development (RAD)
JAD – Joint application design
Data Flow Diagram
(Structured Methodologies/Tools)
Process Specification
(Structured methodologies/tools)
Structure Chart
(Structured Methodologies/Tools)
Object- Oriented Development
Component-based development and Web services
Computer-Aided Software Engineering (CASE)
CASE tools facilitate
Project
Project Management
Project Management Variables
Project Selection
Level of project risk is affected by
Overcoming user resistance
Gantt Chart
PERT Chart
Parallel Conversion
(Step 4)
Plunge (direct cutover) conversion
(Step 4)
Pilot Conversion
(Step 4)
Phased Conversion
(Step 4)
Production
(Step 4)
Maintenance
(Step 4)
Corrective Maintenance
Adaptive Maintenance
Perfective Maintenance
Preventative Maintenance
Change Management
System Development
Causes of
System Development
project failure
Four Steps to Building an Information System
Step 1: Defining and Understanding the Problem
Information Requirements
Step 2: Developing Alternative Solutions
Step 3: Evaluating and Choosing Solutions
Step 4: Implementing the Solution
Testing
Unit Testing
System Testing
Acceptance testing
Training
(Step 4)
Documentation
(Step 4)
Conversion
(Step 4)