Who may consider and approve alternative procedures, methods or equipment standards to be used by a bulk liquid transfer facility operator?
The operator of a bulk liquid transfer facility must submit an LOI to the COTP not less than _____ before intended operations.
How many copies of the operations manual must be submitted?
If the operations manual meets the requirements, the COTP will return one copy of the manual marked _____.
If the COTP requires changes to the operations manual, the facility operator has _____ to submit the amendments.
The operator of a bulk liquid transfer facility must submit the operations manual not less than _____ prior to any transfer.
If a bulk liquid transfer facility is in caretaker status, the operator must submit the operations manual not less than _____ prior to any transfer.
The minimum design burst pressure for each hose assembly must be at least _____ times the pressure of the relief valve plus the static head pressure.
Each mechanical loading arm placed in service after June 30, 1973 must meet the requirements in ANSI _____.
What size discharge containment is required for hoses/loading arms of 6-inch diameter or smaller?
What size discharge containment is required for hoses/loading arms more than 6-inches but less than 12-inches in diameter?
What size discharge containment is required for hoses/loading arms more than 12-inches in diameter or greater?
What size discharge containment is required for a mobile facility?
Each facility must have a means to safely remove discharged oil or hazardous materials within _____ of completion of the transfer.
A facility that first transferred oil on or before November 1, 1980 must have a means to shutdown the flow within _____.
A facility that first transferred oil after November 1, 1980 must have a means to shutdown the flow within _____.
A facility that first transferred hazardous materials before October 4, 1990 must have a means to shutdown the flow within _____.
A facility that first transferred hazardous materials on or after October 4, 1990 must have a means to shutdown the flow within _____.
Illumination at transfer connection points must measure _____ foot candle(s).
Illumination in transfer operation work areas must measure _____ foot candle(s).
The person in charge of transfer operations is required to have at least _____ of experience.
Hot work is prohibited during gas freeing operations within _____ of bulk cargo operations involving flammable materials.
Hot work is prohibited during gas freeing operations within _____ of other hazardous materials.
Records of examinations of the facility by the COTP shall be maintained for _____.
What subpart contains the Facility Response Plan requirements?
Qualified individual notification exercises must be performed _____.
How often must a spill management exercise be conducted?
How often must facility owned equipment deployment exercises be conducted?
How often must OSRO owned equipment deployment exercises be conducted?
A worst case discharge exercise must be conducted at least once every _____.
The facility operator shall ensure that records of all required exercises are maintained at the facility for _____.
Inspection and maintenance records must be maintained for _____.
How many copies of the facility response plan is required to be submitted to the COTP?
How long is the facility response plan valid for?
A facility owner/operator must review his or her response plan(s) _____.