Joshua Villy
Test por , creado hace más de 1 año

1 CSI270 Test sobre Quiz 8, creado por Joshua Villy el 08/05/2013.

109
0
0
Joshua Villy
Creado por Joshua Villy hace más de 11 años
Cerrar

Quiz 8

Pregunta 1 de 25

1

The primary reason for classifying disasters as natural or man-made is:

Selecciona una de las siguientes respuestas posibles:

  • To correctly determine their probable impact

  • To correctly determine their probability of occurrence

  • To classify different types of events to better understand them

  • To determine which contingency plans need to be carried out

Explicación

Pregunta 2 de 25

1

For the purpose of business continuity and disaster recovery planning, the definition of a “disaster” is:

Selecciona una de las siguientes respuestas posibles:

  • Any event that impairs the ability for an organization to continue operating

  • Any natural event that impairs the ability for an organization to continue operating

  • Any man-made event that impairs the ability for an organization to continue operating

  • Any event that impairs the ability for an organization’s IT systems to continue operating

Explicación

Pregunta 3 de 25

1

The primary impact of a pandemic on an organization is:

Selecciona una de las siguientes respuestas posibles:

  • Significant disruptions of public utilities

  • Significant disruptions of transportation systems

  • Large numbers of casualties that reduce the demand for services

  • Long periods of employee absenteeism that impact the organization’s ability to provide services

Explicación

Pregunta 4 de 25

1

The activity that is concerned with the continuation of business operations is:

Selecciona una de las siguientes respuestas posibles:

  • Emergency Response Procedures

  • Disaster Recovery Planning

  • Business Continuity Planning

  • Business Impact Analysis

Explicación

Pregunta 5 de 25

1

The main reason that a DRP project should have executive support and approval is:

Selecciona una de las siguientes respuestas posibles:

  • A DRP project is very expensive

  • A DRP project requires significant adjustments in the allocation of resources

  • A DRP project requires the redesign of all in-scope IT systems

  • A DRP project requires the redesign of all in-scope business processes

Explicación

Pregunta 6 de 25

1

An organization is about to start its first disaster recovery planning project. The project manager is responsible for choosing project team members. Which staff members should be chosen for this project?

Selecciona una de las siguientes respuestas posibles:

  • The project should use outsourced technical experts

  • The least experienced team members

  • The most experienced team members

  • The project should use outsourced disaster recovery planning experts

Explicación

Pregunta 7 de 25

1

At the beginning of a disaster recovery planning project, the project team will be compiling a list of all of the organization’s most important business processes. This phase of the project is known as:

Selecciona una de las siguientes respuestas posibles:

  • Business Impact Analysis

  • Risk Analysis

  • Business Process Analysis

  • Determination of maximum tolerable downtime (MTD)

Explicación

Pregunta 8 de 25

1

In what sequence should a disaster recovery planning project be performed?

Selecciona una de las siguientes respuestas posibles:

  • Business Impact Analysis, Maximum Tolerable Downtime, Recovery Point Objective, Recovery Time Objective, training, testing

  • Survey business processes, threat and risk analysis, develop recovery targets, criticality analysis

  • Project plan, risk assessment, statements of impact, criticality analysis, recovery targets, test recovery plans

  • Project plan, Business Impact Analysis, develop recovery plans, train personnel, test recovery plans

Explicación

Pregunta 9 de 25

1

Benefits from disaster recovery and business continuity planning include all of the following EXCEPT:

Selecciona una de las siguientes respuestas posibles:

  • Improved system resilience

  • Process improvements

  • Improved market advantage

  • Improved performance

Explicación

Pregunta 10 de 25

1

The types of BCP and DRP tests are:

Selecciona una de las siguientes respuestas posibles:

  • Document review, walkthrough, parallel test, cutover test

  • Document review, walkthrough, simulation, parallel test, cutover test

  • Document review, walkthrough, sanity test, parallel test, cutover test

  • Walkthrough, simulation, parallel test, cutover test, live test

Explicación

Pregunta 11 de 25

1

The purpose of a cutover test is:

Selecciona una de las siguientes respuestas posibles:

  • To determine the ability to perform live business transactions on production systems instead of on backup systems

  • To determine the ability for a recovery test to be interrupted

  • To determine the ability to perform live business transactions on production systems and backup systems at the same time

  • To determine the ability for the last minute substitution of a recovery team

Explicación

Pregunta 12 de 25

1

The purpose of a parallel test is:

Selecciona una de las siguientes respuestas posibles:

  • To determine the ability to perform live business transactions on production systems instead of on backup systems

  • To determine the ability for a recovery test to be interrupted

  • To determine the ability to perform live business transactions on production systems and backup systems at the same time

  • To determine the ability for the last minute substitution of a recovery team

Explicación

Pregunta 13 de 25

1

The greatest risk related to a cutover test is:

Selecciona una de las siguientes respuestas posibles:

  • If backup servers do not function correctly, the test will fail

  • A cutover test tests only the live load and not the switchover

  • A cutover test tests only the switchover and not the live load

  • If backup servers do not function correctly, critical business processes may fail

Explicación

Pregunta 14 de 25

1

A project team has just completed building the organization’s business continuity plan. Which of the following tests should be performed first?

Selecciona una de las siguientes respuestas posibles:

  • Walkthrough

  • Simulation

  • Parallel test

  • Cutover test

Explicación

Pregunta 15 de 25

1

An organization that is building a disaster recovery capability needs to re-engineer its application servers to meet new recovery requirements of 4 hour RPO and 24 hour RTO. Which of the following approaches will best meet this objective?

Selecciona una de las siguientes respuestas posibles:

  • Active/Passive server cluster with replication

  • Tape backup and restore to a hot site

  • Tape backup and restore to a cold site

  • Server cluster with shared storage

Explicación

Pregunta 16 de 25

1

The purpose of a server cluster includes all of the following EXCEPT:

Selecciona una de las siguientes respuestas posibles:

  • Improve an application’s availability

  • Increase an application’s capacity

  • Increase an application’s data storage

  • Provide fault tolerance

Explicación

Pregunta 17 de 25

1

The purpose of off-site media storage is:

Selecciona una de las siguientes respuestas posibles:

  • To protect media from damage in the event of a disaster

  • To protect media from theft

  • To provide additional storage not available on-site

  • To meet regulatory requirements for media protection

Explicación

Pregunta 18 de 25

1

An organization that is performing a disaster recovery planning project has determined that it needs to have on-site electric power available for as long as ten days, in the event of an electric utility failure. The best approach for this requirement is:

Selecciona una de las siguientes respuestas posibles:

  • Uninterruptible power supply (UPS) and power distribution unit (PDU)

  • Electric generator

  • Uninterruptible power supply (UPS)

  • Uninterruptible power supply (UPS) and electric generator

Explicación

Pregunta 19 de 25

1

The first priority for disaster response should be:

Selecciona una de las siguientes respuestas posibles:

  • Backup media

  • Paper records

  • Personnel safety

  • Remote access

Explicación

Pregunta 20 de 25

1

Which of the following would NOT be on a list of parties to notify in the event of a disaster-related emergency:

Selecciona una de las siguientes respuestas posibles:

  • Civil authorities

  • Utilities

  • Shareholders

  • Customers

Explicación

Pregunta 21 de 25

1

Why is disaster recovery-related training a vital component in a DRP project?

Selecciona una de las siguientes respuestas posibles:

  • The plan will be able to be certified

  • Recovery is performed by outside organizations

  • The personnel who are most familiar with systems may be unavailable during a disaster

  • Personnel may be unfamiliar with recovery procedures

Explicación

Pregunta 22 de 25

1

Why is it important to understand the cost of downtime of critical business processes?

Selecciona una de las siguientes respuestas posibles:

  • Management will be able to make decisions about the cost of mitigating controls and contingency plans

  • Management will be able to determine which processes are the most critical

  • Management will be able to establish a training budget

  • Management will be able to compare recovery costs with those in similar organizations

Explicación

Pregunta 23 de 25

1

The definition of Recovery Point Objective (RPO) is:

Selecciona una de las siguientes respuestas posibles:

  • The location of the recovery site

  • The maximum amount of downtime

  • The method used to recover backup data

  • The maximum amount of data loss

Explicación

Pregunta 24 de 25

1

The definition of Recovery Time Objective (RTO) is:

Selecciona una de las siguientes respuestas posibles:

  • The location of the recovery site

  • The maximum amount of downtime

  • The method used to recover backup data

  • The maximum amount of data loss

Explicación

Pregunta 25 de 25

1

A DRP project team has determined that the RTO for a specific application shall be set to 180 minutes. Which option for a recovery system will best meet the application’s recovery needs?

Selecciona una de las siguientes respuestas posibles:

  • Hot standby systems and tape recovery

  • Server clustering and data replication

  • Warm standby systems and tape recovery

  • Cold site and tape recovery

Explicación