Created by Kevin Muncie
almost 7 years ago
|
||
Question | Answer |
Verification | Deals with processes that ensure the software is being built correctly |
Validation | Deals with processes that ensure that the correct software is being built |
Static V&V | Deals with software inspections |
Dynamic V&V | This deals with software testing |
IV&V characteristics | 1 Includes Risk identification and Mitigation techniques 2 Provides Independent evaluation 3 Requires technical managerial and financial independence 4 Makes a value added contribution, everyone shares the same mission success objective |
Iv&V and the SDLC | Concept phase Requirements phase Design phase Coding phase Test phase Operational phase |
IV&V Benefits | Better software/performance Higher confidence in software reliability Compliance between specs and code Criteria for program acceptance Better visibility into development Better decision criteria Second source technical alternative Reduced maintenance cost Reduced frequency of operational change |
Want to create your own Flashcards for free with GoConqr? Learn more.