Contracts - Arch-Consultant Agrmt AIA Doc C401

Description

PPM ARE 5.0 PPM (Project Planning & Mgmt) Ballast Review Flashcards on Contracts - Arch-Consultant Agrmt AIA Doc C401, created by Kara Biczykowski on 01/10/2021.
Kara Biczykowski
Flashcards by Kara Biczykowski, updated more than 1 year ago
Kara Biczykowski
Created by Kara Biczykowski about 3 years ago
15
0

Resource summary

Question Answer
1) when consultants are used for a project, AIA Doc (__) is used: 2) this doc states the consultant is an: 3) it states for their portion of the project they must perform services w/: 4) it states all communication btwn consultant & owner, contractor, or oth consultants must go thru: 1) C401 Standard Form of Agrmt Btwn Arch & Consultant 2) independent contractor 3) the same standard of care as oth profs. practicing in the same or sim locality under the same or sim. circum. 4) the architect
1) C401 also states the consultant is not responsible for: 1) the acts or omissions of the arch, the archs oth consultants, contractors, subcontractors, agents or employees, or oths performing any of the work
CONSULTANT RESPONSIBILITIES 1) recommend to the arch the appropriate: 2) coord. their services w/ the: 3) prov. (__) to the arch & oth consultants as needed 4) prov. a (__) for the consultants work for the archs approval 1) surveys, tests, analyses, reports, & services of oth consultants needed 2) arch & oth consultants 3) copies of dwgs, reports, specs & oth necessary info 4) schedule
CONSULTANT RESPONSIBILITIES 6) assist the arch in determining whether or not the arch will: 6) reject work for the consultants portion of the project or whether additional inspection or testing is reqd
ARCHITECT RESPONSIBILITIES 1) the arch is reqd to prov. in a timely manner all of the: 2) ^ this includes: 1) relevant project info that pertains to the design & coord. of the consultants portion of the work 2) detailed layouts showing location of connections, tabulations giving size, loads, oth info on equip designed, specified, or supplied by oths
1) example - the arch must provide the elec consultant w/ an itemized list of: 2) the arch is entitled to rely on the accuracy & completeness of: 3) the arch must inform consultants about: 1) equip., model numbers, detailed elec reqs of any equip determined in the programming phase of the project 2) services & info prov. by consultant 3) code reqs that apply to their portion of work & design decisions that may have code implications
1) although arch is responsible for ensuring the dwgs & specs conform to applicable codes, ea. consultant is responsible for code compliance in: 2) by signing their dwgs, engineering consultants become responsible for: 3) as the arch is the primary consultant they are liable to: 1) their area of work (sim. to how arch is responsible to owner under the B101) 2) compliance w/ applicable codes & regs, accurate production of their dwgs & specs, checking their docs for consistency 3) the owner for the consultants work
Show full summary Hide full summary

Similar

Contracts - Supplementary & Special Conds of the Contract
Kara Biczykowski
Contracts - Owner-Arch Agreement B101
Kara Biczykowski
Contracts - Gen Conds of the Contract for a Sustainable Project AIA Doc A201 SP
Kara Biczykowski
Contracts - B101 SP (Sustainable Project)
Kara Biczykowski
Project Quality Control
Kara Biczykowski
Project Planning & Mgmt
Kara Biczykowski
Sustainable Design
Kara Biczykowski
Contracts - Owner-Contractor AIA Doc A101
Kara Biczykowski
Project Execution
Kara Biczykowski
Construction Administration
Kara Biczykowski
Contracts - Gen Cond's of the Contract for Const. AIA Doc A201
Kara Biczykowski