Big Gate

Description

Flashcards on Big Gate, created by Jake U on 20/09/2015.
Jake U
Flashcards by Jake U, updated more than 1 year ago
Jake U
Created by Jake U about 9 years ago
18
1

Resource summary

Question Answer
Big Gate (word for word) Step 1 Safely dismount the apparatus wearing all PPE carrying a radio
Step 2 Remove the hydrant gate from the rear of the apparatus
Step 3 Wrap 125mm hose around the hyrdant
Step 4 Stand on the hose and signal small gate when ready
Step 5 When the apparatus is stopped or when it is safe to do so, remove steamer cap from hyrdant
Step 6 Inspect the barrel of the hydrant and connect gate
Step 7 Ensure that the drain valve is in open position
Step 8 Radio or signal driver or sector officer that you are ready to turn on the hydrant
Step 9 Open hydrant when ordered by driver or sector officer, close drain valve
Step 10 Gather tools, remove kinks in hose, and report to your officer for reassignment
Show full summary Hide full summary

Similar

Rank Structure Policies
Jake U
Water supply and hydraulics Part 1
Jake U
Water supply and hydraulics part 2
Jake U
Fire behavior (50 cards)
Jake U
Small gate
Jake U
Themes in Lord of the Flies
lowri_luxton
AQA A2 Biology Unit 4: Populations
Charlotte Lloyd
GCSE Biology B2 (OCR)
Usman Rauf
The Digestive system
Elena Cade
The Rise of the Nazis
shann.w
Using GoConqr to study Maths
Sarah Egan