SAB9#36_37_Planning_Scope & Plan_Scope_Mgmt
  1. Project Management plan
    1. Since you’re in the process of creating these plans for the other knowledge areas at the same time as this one, there’s a good chance that you can use some of the same ideas in this plan that you’ve uncovered in the process of creating your Time Management plan, your Cost Management plan, or any of the other subsidiary plans.
    2. Project charter
      1. The charter already includes a high-level description of the scope of the project. So it’s a good place to start.
      2. EEFs (Enterprise environmental factors)
        1. Your company’s culture and accepted practices will have a big impact on the way you manage scope on this project too.
        2. OPAs (Organizational process assets)
          1. The Plan Scope Management process is where you lay out your approach to figuring out what work you’ll do and what’s out of scope.
            1. Product Scope
              1. Product scope means the features and functions of the product or service that you and your team are building.
                1. The product scope is all about the final product—its features, components, pieces.
              2. Project scope
                1. Project scope is all of the work that needs to be done to make the product.
                2. Scope creep
                  1. Scope creep means uncontrolled changes that cause the team to do extra work.
                3. Expert judgment
                  1. Meetings
                    1. You might need to hold a meeting with some of the project’s stakeholders to agree on an approach.
                    2. Plan Scope Management
                      1. Here’s where you write down the subsidiary plan for the project management plan that we talked about in the last chapter. You plan out all of the work you’ll do to define your scope, make sure the team is planning to do the right work, and control it.
                        1. Requirements Management plan
                          1. Here’s where you’ll find a description of the approach the team will take to planning, tracking, and reporting on requirements. You’ll use this document to describe the prioritization process for requirements, and how you’ll build a traceability matrix for your requirements as well.
                          2. Scope Management plan
                            1. Here’s where you write down the subsidiary plan for the Project Management plan that we talked about in Chapter 4. You plan out all of the work you’ll do to define your scope, with the right work planned for the team, and control it.
                          3. Collect Requirements
                            1. In this process, you find out all of the stakeholders’ needs and write them down so that you know what to build and your requirements can be measured and tracked.
                            2. Define Scope
                              1. Here’s where you write down a detailed description of the work you’ll do and what you’ll produce.
                              2. Create WBS
                                1. The work breakdown structure (WBS) organizes all of your team’s work into work packages—or discrete pieces of work that team members do—so that you can keep the momentum of the project going from the start.
                                2. Control Scope
                                  1. We already know how important it is to control changes on your project. When scope changes aren’t controlled, it leads to the most frustrating sort of project problems. Luckily, you already know about change control, and now you can use it to manage your project’s scope.
                                  2. Validate Scope
                                    1. Once the work is complete, you need to make sure that what you’re delivering matches what you wrote down in the project scope statement. That way, the team never delivers the wrong product to the customer.
                                    Show full summary Hide full summary

                                    Similar

                                    9 History- The Treaty of Versailles
                                    melgallagher
                                    CHEMISTRY C1 5
                                    x_clairey_x
                                    IB Chem Flashcards
                                    j. stu
                                    Macbeth - Charcters
                                    a.agagon
                                    20 Study Hacks To Improve Your Memory
                                    jen.sch.ca
                                    Input and Output Devices
                                    Jess Peason
                                    An Inspector Calls: Mr Arthur Birling
                                    Rattan Bhorjee
                                    C1:Making Crude Oil Useful (Science-GCSE)
                                    Temi Onas
                                    Edexcel Additional Science Chemistry Topics 1+2
                                    El Smith
                                    PSBD TEST # 3
                                    Suleman Shah
                                    The Lymphatic System
                                    james liew