null
US
Sign In
Sign Up for Free
Sign Up
We have detected that Javascript is not enabled in your browser. The dynamic nature of our site means that Javascript must be enabled to function properly. Please read our
terms and conditions
for more information.
Next up
Copy and Edit
You need to log in to complete this action!
Register for Free
103682
Tolerate, treat, transfer and terminate
Description
A-Levels 4. Risk Response Mind Map on Tolerate, treat, transfer and terminate, created by helen_woolford on 22/05/2013.
No tags specified
4. risk response
4. risk response
a-levels
Mind Map by
helen_woolford
, updated more than 1 year ago
More
Less
Created by
helen_woolford
over 11 years ago
2216
0
0
Resource summary
Tolerate, treat, transfer and terminate
The 4Ts of hazard management
Significant risks
Board level of risk
Risk Treatment
ISO 31000 BS31100
Tolerate risk
Comfortable zone
Legal or regulatory
Detective control
Treat risk
cost effective treatment
Inherent level
Corrective control
Transfer risk
Insurance
Joint ventures
Contractual agreement
Directive control
Risk financing
Terminate risk
Preventative controls
Unacceptable level of risk
Elimination may not be possible
Public sector
Project and Strategic responses
The 4As of project management
Contractual arrangements
contingency plans
Avoid high risks
The 4E of strategy
risk and reward
Joint ventures
Enter text here
Show full summary
Hide full summary
Want to create your own
Mind Maps
for
free
with GoConqr?
Learn more
.
Similar
Insurance and risk transfer
helen_woolford
Control of selected hazard risks
helen_woolford
Enterprise Risk Management
helen_woolford
Risk Appetite
helen_woolford
Risk control techniques
helen_woolford
Chapter 4
helen_woolford
Segunda Guerra Mundial 1939-1945
miminoma
AS Pure Core 1 Maths (AQA)
jamesmikecampbell
English Grammatical Terminology
Fionnghuala Malone
Macbeth - Charcters
a.agagon
History- Medicine through time key figures
gemma.bell
Browse Library