LEC 1-DRILLING

Description

semester petrol 2 Mind Map on LEC 1-DRILLING, created by Hoa Truong on 12/08/2015.
Hoa Truong
Mind Map by Hoa Truong, updated more than 1 year ago
Hoa Truong
Created by Hoa Truong over 9 years ago
11
0

Resource summary

LEC 1-DRILLING
  1. WHY
    1. only way to bring oil+gas->surface
      1. only way to direct locate HC +its flowrate
        1. sampling subsurface geology
          1. extract+inject fluid
            1. world need for energy, 30 billions bbl/year (2010)
              1. 450 years worth of plants burn/year in fossil fuel
            2. HISTORY
              1. 1st commercial oil productn.: 27/08/1859 Drake Well, Pennsylvania
                1. oil for light until light bulb invent 1878
                  1. late 1800s, oil: car fuels,ship, plane,locomotive energy
              2. politic<=>Price<=>supply/demand<=> drilling activity
                1. Deep water, extreme temp, remote areas drilling
                  1. >cost, >complicated, risky, temp decrease at sea bed->viscosity+transport
                  2. EXPLORATION
                    1. DRILLING
                      1. COMPLETION
                        1. PRODUCTION
                          1. complete drill for well efficient+ exact fluid
                      2. Drilling engineer
                        1. Casting Program
                          1. Mud program
                            1. Drilling hydrolic +solid control program
                              1. site, rig, well path plan
                                1. specific specialist equipment needed
                                  1. Well control
                                    1. Monitor, drill bit, rig selection
                                      1. Fishing operation
                                        1. Evaluation program
                                          1. maintain regulatory compliance
                            2. completion
                              1. cementation
                              2. making hole- ready for completion
                              3. WELLS
                                1. Types
                                  1. 1. Wildcat/Explor.n Well
                                    1. prove existance HC, collect info- tests- understand reservoir- stimulate models subsurface physical map- cal. ~oil/gas commercial
                                    2. 2. Appraisal/ Evaluation Well
                                      1. define abundant + deposition of reservoir, rock+fluid properties, flow press. production capacity, analyse cooring+ logging
                                        1. costly, time consuming, test while drill for data
                                        2. 3. Development/ Production Well
                                          1. drill for just prod.n, some testing - improve models, monitor
                                            1. less cost
                                            2. different types require different equip, design,risk
                                          Show full summary Hide full summary

                                          Similar

                                          LECTURE 22
                                          Hoa Truong
                                          Lecture23
                                          Hoa Truong
                                          LECTURE 20
                                          Hoa Truong
                                          LECTURE 21
                                          Hoa Truong
                                          Life in Germany
                                          Ben C
                                          Treaty of Versailles (1919)
                                          Inez Simpson
                                          “The knower’s perspective is essential in the pursuit of knowledge.” To what extent do you agree with this statement?
                                          Lucia Rocha Mejia
                                          George- Of mice and men
                                          Elinor Jones
                                          Project Scope Management Process
                                          neeshar
                                          Physics - Electricity
                                          dana-howbridge
                                          AQA AS Biology - Pathogens and Disease
                                          dillyrules