SAB7#43_SCOPE_LEVELS
  1. Activity
    1. PMI considers an activity to be a particular piece of work scheduled for the project.
    2. Work package
      1. The work package is the lowest level on a WBS, the higher levels are used to categorize the work packages.
      2. Control account
        1. Tool that allows for the analysis of work performance data regarding costs, schedule, and scope. Control accounts provide a way to manage and control costs, schedule, and scope at a higher level than the work package.
        Show full summary Hide full summary

        Similar

        Economics definitions: F582
        busybee112
        GCSE PE - 6
        lydia_ward
        Tourism 1
        Scott Church
        STEM AND LEAF DIAGRAMS
        Elliot O'Leary
        Musical Symbols
        kcollins3
        German Irregular Verbs
        Shane Buckley
        A-level Maths: Key Differention Formulae
        humayun.rana
        GoConqr Getting Started Guide
        Norman McBrien
        Data Types
        Jacob Sedore
        Genes, The Genetic Code, DNA and Chromosomes
        Bee Brittain
        Medicine Through Time - Keywords
        Lara Jackson