CM 434 Lean Construction

Description

Mind Map on CM 434 Lean Construction, created by Ruben De Leon on 31/05/2017.
Ruben De Leon
Mind Map by Ruben De Leon, updated more than 1 year ago
Ruben De Leon
Created by Ruben De Leon over 7 years ago
103
0

Resource summary

CM 434 Lean Construction
  1. LEAN SUPPLY CHAIN MANAGEMENT
    1. Attributes Construction Supply Chain (
      1. Push vs Pull
        1. Push
          1. Materials released on pre-determined schedule
            1. , cost is increased inventory
            2. Pull
              1. Downstream stakeholders
                1. Release triggered by customer(s
                2. Pull w/Bulk Materials
                  1. Kanban
                    1. Customer withdraws from “supermarket
                      1. supermarket then gets replenished by issuing production Kanban; largely visual
                    2. No shop drawings
                      1. Prevents Over Production
                        1. Allows tightly bounded inventory to build up between supplier and customer process
                        2. Material purchased from uniformly produced lots
                          1. → Generally need to have some on-site inventory
                            1. Costs association
                        3. Pull w/ ETO Products
                          1. Requirements
                            1. Lead time
                              1. Look ahead window
                              2. Shop Drawings
                                1. Increase Look Ahead window
                                  1. Easier to perform
                                  2. Reduce Lead time
                            2. Product Types
                              1. Bulk
                                1. MTO
                                  1. ETO
                                  2. Construction Companies generally do not control supply chain
                                    1. Local optimization is limitation of construction
                                      1. Material MGMT Factors
                                        1. space, price, planning (demand) reliability, lead time
                                    2. LEAN DESIGN
                                      1. Pull in Design
                                        1. Target Value Design (TVD)
                                          1. Integrated Design (IDP)
                                            1. Choose-by-advantage (CBA)
                                            2. INTEGRATED PROJECT DELIVERY
                                              1. Attributes
                                                1. Integrate Project Delivery
                                                  1. GMP vs EMP
                                                    1. Contractual Methods for Sharing Pain/Gain
                                                    2. ACTIVITY-BASED COSTING
                                                      1. Two goals of ABC
                                                        1. Mechanisms
                                                          1. Cost Drivers
                                                          Show full summary Hide full summary

                                                          Similar

                                                          Hitler's rise to Chancellorship Jan '33
                                                          Simon Hinds
                                                          Respiratory System
                                                          bridget.watts97
                                                          Chemistry 1
                                                          kelsey.le.grange
                                                          The Flowering Plant and Photosynthesis
                                                          lalalucy13
                                                          English Placement Test
                                                          CoachDanielDixon
                                                          FORM AND STRUCTURE: ROMEO AND JULIET
                                                          Sarah Soler
                                                          Australia vs UK PE
                                                          Cal Jones
                                                          Sociology - Crime and Deviance - Feminists
                                                          josaul1996
                                                          The Tempest Key Themes
                                                          Joe Brown
                                                          Atomic Structure
                                                          dpr898