1) when consultants are used for a project, AIA Doc (__) is used: 2) this doc states the consultant is an: 3) it states for their portion of the project they must perform services w/: 4) it states all communication btwn consultant & owner, contractor, or oth consultants must go thru: | 1) C401 Standard Form of Agrmt Btwn Arch & Consultant 2) independent contractor 3) the same standard of care as oth profs. practicing in the same or sim locality under the same or sim. circum. 4) the architect |
1) C401 also states the consultant is not responsible for: | 1) the acts or omissions of the arch, the archs oth consultants, contractors, subcontractors, agents or employees, or oths performing any of the work |
CONSULTANT RESPONSIBILITIES 1) recommend to the arch the appropriate: 2) coord. their services w/ the: 3) prov. (__) to the arch & oth consultants as needed 4) prov. a (__) for the consultants work for the archs approval | 1) surveys, tests, analyses, reports, & services of oth consultants needed 2) arch & oth consultants 3) copies of dwgs, reports, specs & oth necessary info 4) schedule |
CONSULTANT RESPONSIBILITIES 6) assist the arch in determining whether or not the arch will: | 6) reject work for the consultants portion of the project or whether additional inspection or testing is reqd |
ARCHITECT RESPONSIBILITIES 1) the arch is reqd to prov. in a timely manner all of the: 2) ^ this includes: | 1) relevant project info that pertains to the design & coord. of the consultants portion of the work 2) detailed layouts showing location of connections, tabulations giving size, loads, oth info on equip designed, specified, or supplied by oths |
1) example - the arch must provide the elec consultant w/ an itemized list of: 2) the arch is entitled to rely on the accuracy & completeness of: 3) the arch must inform consultants about: | 1) equip., model numbers, detailed elec reqs of any equip determined in the programming phase of the project 2) services & info prov. by consultant 3) code reqs that apply to their portion of work & design decisions that may have code implications |
1) although arch is responsible for ensuring the dwgs & specs conform to applicable codes, ea. consultant is responsible for code compliance in: 2) by signing their dwgs, engineering consultants become responsible for: 3) as the arch is the primary consultant they are liable to: | 1) their area of work (sim. to how arch is responsible to owner under the B101) 2) compliance w/ applicable codes & regs, accurate production of their dwgs & specs, checking their docs for consistency 3) the owner for the consultants work |