Questão | Responda |
Big Gate (word for word) Step 1 | Safely dismount the apparatus wearing all PPE carrying a radio |
Step 2 | Remove the hydrant gate from the rear of the apparatus |
Step 3 | Wrap 125mm hose around the hyrdant |
Step 4 | Stand on the hose and signal small gate when ready |
Step 5 | When the apparatus is stopped or when it is safe to do so, remove steamer cap from hyrdant |
Step 6 | Inspect the barrel of the hydrant and connect gate |
Step 7 | Ensure that the drain valve is in open position |
Step 8 | Radio or signal driver or sector officer that you are ready to turn on the hydrant |
Step 9 | Open hydrant when ordered by driver or sector officer, close drain valve |
Step 10 | Gather tools, remove kinks in hose, and report to your officer for reassignment |
Quer criar seus próprios Flashcards gratuitos com GoConqr? Saiba mais.