Bulk Liquid Transfer Facility Regulations

Descrição

Facilities FlashCards sobre Bulk Liquid Transfer Facility Regulations, criado por Joshua Vance em 03-11-2016.
Joshua Vance
FlashCards por Joshua Vance, atualizado more than 1 year ago
Joshua Vance
Criado por Joshua Vance aproximadamente 8 anos atrás
5
0

Resumo de Recurso

Questão Responda
Who may consider and approve alternative procedures, methods or equipment standards to be used by a bulk liquid transfer facility operator? COTP
The operator of a bulk liquid transfer facility must submit an LOI to the COTP not less than _____ before intended operations. 60 days
How many copies of the operations manual must be submitted? 2
If the operations manual meets the requirements, the COTP will return one copy of the manual marked _____. Examined by the Coast Guard
If the COTP requires changes to the operations manual, the facility operator has _____ to submit the amendments. 45 days
The operator of a bulk liquid transfer facility must submit the operations manual not less than _____ prior to any transfer. 60 days
If a bulk liquid transfer facility is in caretaker status, the operator must submit the operations manual not less than _____ prior to any transfer. 30 days
The minimum design burst pressure for each hose assembly must be at least _____ times the pressure of the relief valve plus the static head pressure. 4
Each mechanical loading arm placed in service after June 30, 1973 must meet the requirements in ANSI _____. B31.3
What size discharge containment is required for hoses/loading arms of 6-inch diameter or smaller? 2 barrels
What size discharge containment is required for hoses/loading arms more than 6-inches but less than 12-inches in diameter? 3 barrels
What size discharge containment is required for hoses/loading arms more than 12-inches in diameter or greater? 4 barrels
What size discharge containment is required for a mobile facility? 5 gallons
Each facility must have a means to safely remove discharged oil or hazardous materials within _____ of completion of the transfer. 1 hour
A facility that first transferred oil on or before November 1, 1980 must have a means to shutdown the flow within _____. 60 seconds
A facility that first transferred oil after November 1, 1980 must have a means to shutdown the flow within _____. 30 seconds
A facility that first transferred hazardous materials before October 4, 1990 must have a means to shutdown the flow within _____. 60 seconds
A facility that first transferred hazardous materials on or after October 4, 1990 must have a means to shutdown the flow within _____. 30 seconds
Illumination at transfer connection points must measure _____ foot candle(s). 5.0
Illumination in transfer operation work areas must measure _____ foot candle(s). 1.0
The person in charge of transfer operations is required to have at least _____ of experience. 48 hours
Hot work is prohibited during gas freeing operations within _____ of bulk cargo operations involving flammable materials. 30.5 meters (100 feet)
Hot work is prohibited during gas freeing operations within _____ of other hazardous materials. 15.25 meters (50 feet)
Records of examinations of the facility by the COTP shall be maintained for _____. 3 years
What subpart contains the Facility Response Plan requirements? 33 CFR 154 Subpart F
Qualified individual notification exercises must be performed _____. quarterly
How often must a spill management exercise be conducted? Annually
How often must facility owned equipment deployment exercises be conducted? Semi-annually
How often must OSRO owned equipment deployment exercises be conducted? Annually
A worst case discharge exercise must be conducted at least once every _____. 3 years
The facility operator shall ensure that records of all required exercises are maintained at the facility for _____. 3 years
Inspection and maintenance records must be maintained for _____. 3 years
How many copies of the facility response plan is required to be submitted to the COTP? 1
How long is the facility response plan valid for? 5 years
A facility owner/operator must review his or her response plan(s) _____. Annually

Semelhante

Venue and Facility Management Exam
christineaukusitino
PSBs and Conglomerates
Amy Cunnington
Enter text here
soccerchica_15
Facility Security Regulations
Joshua Vance
Coast Guard History
Joshua Vance
Enlisted Heritage
Joshua Vance
MARPOL Regulations
Joshua Vance
Coast Guard History
Joshua Vance
Coast Guard Organization
Joshua Vance
Armed Forces Rates/Ranks/Paygrades
Joshua Vance
Shoreline Assessment
Joshua Vance