SAB7#27_Details_Project_Mgmt_Plan

Descrição

Mapa Mental sobre SAB7#27_Details_Project_Mgmt_Plan, criado por anselmo_rocha em 01-08-2015.
anselmo_rocha
Mapa Mental por anselmo_rocha, atualizado more than 1 year ago
anselmo_rocha
Criado por anselmo_rocha quase 9 anos atrás
36
1

Resumo de Recurso

SAB7#27_Details_Project_Mgmt_Plan
  1. Project Management Plan is the document that integrates all the individual management plans into a cohesive whole, creating a centralized document to describe what is involved in the project.
    1. Scope Mgmt Plan
      1. Schedule Mgmt Plan
        1. Cost Mgmt Plan
          1. HR Mgmt Plan
            1. Procurment Mgmt Plan
              1. Risk Mgmt Plan
                1. Quality Mgmt Plan
                  1. Communication Mgmt Plan
                    1. PROJECT MANAGEMENT PLAN
                      1. Stakeholders Mgmt Plan
                        1. Scope Baseline: Is the projet scope statment, WBS and WBS dictionary
                          1. Schedule Baseline: this includes the start and stop dates for each activity
                            1. Cost Baseline: this includes the cost for each activity of the WBS
                              1. Project Baselines: This are used to compare the project's actual performance against its planned performance
                                1. Requirements Mgmt Plan: This describes how this effort of identifying, analyzing, evaluating, prioritizing and documenting the requirements of the stakeholders will be done as well as how the requirements will be managed and controlled througout the project
                                  1. Change Mgmt Plan: This is a plan for managing changes and the change process on the project
                                    1. Configuration Mgmt Plan: This is a plan for managing changes to the documentation about the deliverables and processes of the project
                                      1. Process Improvement Plan: This plan defines how processes that are used on the project to complet the work or perform project management activities will be evaluated and improved

                                        Semelhante

                                        Matemática Básica
                                        Alessandra S.
                                        Exame Nacional de Português - 12° ano
                                        Felipe Perreira
                                        CAE - Cambridge Advanced: English
                                        Luiz Fernando
                                        Cinética Química
                                        GoConqr suporte .
                                        Administração Financeira e Orçamentária
                                        Raphael Luiz Fonseca
                                        geologia 10 ano
                                        isabelinha_oli_97
                                        Direito Previdenciário INSS 2015
                                        André Cavallini
                                        II Guerra Mundial
                                        GoConqr suporte .
                                        Reino Fungi
                                        Rafael Gussi
                                        Cálculo: Equações Diferenciais
                                        Luciana Amaral Pereira Freire
                                        Imperialismo e Neocolonialismo
                                        Daniel Lima