SAB9#50_51_PLANNING SCHEDULE_PLAN SCHEDULE_MGMNT
  1. Project Management Plan
    1. Scope Baseline
    2. Project Charter
      1. High-Level Milestones
      2. EEF´s
        1. Culture, PMIS
        2. OPA´s
          1. Templates, Learned Lessons
          2. Plan Schedule Management
            1. SCHEDULE MANAGEMENT PLAN
              1. Includes: Scheduling Methodology and Scheduling SW to be used. Rules for how estimates should be stated. Establishment of a Schedule Baseline.Identification of the performance meausures. Determination of acceptable variance. How Schedule variances will be identified and managed. Identification of Schedule Change Control Procedures. Reporting Formats to be used.
              2. Define the processes to plan & control the schedule
              3. Define Activities
                1. List of all of the Activities that will need to be completed. It is the basis for the Network Diagram
                2. Sequence Activities
                  1. Figure out which activities need to come before others and put them in the right order.
                    1. Project Schedule Network Diagram
                    2. Estimate Activity Resources
                      1. Who and what are needed to get the project done.
                      2. Estimate Activity Durations
                        1. Time it will take to do each activity.
                        2. Develop Schedule
                          1. Build a Schedule from all of the estimates and the resource and activity information. It Predicts the Project End Date.
                          2. Control Schedule
                            1. Monitor and Control Changes to the Schedule to make sure that is kept up to date.
                            2. Tools: Expert Judgment, Analytical Techniques, Meetings.
                              1. How you will plan, manage and control the Project Schedule. Must be REALISTIC.

                                Semelhante

                                Livros para ler para o Vestibular
                                Alessandra S.
                                Recrutamento e seleção de pessoas
                                brunocmt
                                Guia de Estudos para o ENEM 2014
                                Alessandra S.
                                Phrasal Verbs II
                                GoConqr suporte .
                                Revisão Para o ENEM em 20 dias
                                GoConqr suporte .
                                Citologia IV (Organelas celulares)
                                Luiz Antonio Lopes
                                Improbidade Administrativa - Lei 8429/92 - Arts. 1º ao 8º
                                Suzy Nobre
                                Guia Rápido do Usuário
                                GoConqr suporte .
                                Transformações Químicas e Físicas
                                Andrea Barreto M. Da Poça
                                Art. 5º da CF/88
                                Luís Felipe Mesiano
                                Citações para Redação - ENEM
                                Jayne Torres