null
US
Entrar
Registre-se gratuitamente
Registre-se
Detectamos que o JavaScript não está habilitado no teu navegador. Habilite o Javascript para o funcionamento correto do nosso site. Por favor, leia os
Termos e Condições
para mais informações.
Próximo
Copiar e Editar
Você deve estar logado para concluir esta ação!
Inscreva-se gratuitamente
6354988
1e - Project Team
Descrição
A level, A2 IT (Chapter 1) Mapa Mental sobre 1e - Project Team, criado por Gladys Mba em 15-09-2016.
Sem etiquetas
a-level
a2
ict
ocr
chapter 1
it
chapter 1
a level, a2
Mapa Mental por
Gladys Mba
, atualizado more than 1 year ago
Mais
Menos
Criado por
Gladys Mba
mais de 8 anos atrás
4
1
0
Resumo de Recurso
1e - Project Team
Project Manager
Makes Financial plans
Predicts Budget
Plans and monitors Expenditure
Manages timing, deadlines and schedules
Uses tools such as Gantt charts, critical path analysis
Manages Personel
Main point of contact for staff
Responsible for whole project
Makes sure documentation is completed by the right people, on time, and delivered to costumer.
Quality control
Systems Analyst
Investigation and analysis stage
Writes requirement specification
Analysis current system
Examine documents
Interview user
Write, issue and analyse questionnaire
Observe company functions
Systems Designer
Design stage
Design and plan all the system
Follows requirement specification
Creates design specification and test plan
Talks with analyst before this stage
Talks with programmer before and during development stage.
Talks with client for feedback
Programmer
Implementation/ Development stage
Talks with client for project feedback
Follows design specification
Talks with system designer
Creates software solutions and technical documents
Including any programming code
Tester
Testing stage
Follows test plan by designer or creates a test plan
Selects test data
Conducts black (modular) and white (whole system) box testing
Tests the user documentation
Looks for error in system
Works against programmer
Programmers are less motivated to find errors
Test system to limits
Documents results in testing
Feedback to programmer to improve system
Need for a Team
O- Custom-written solutions are usually large projects
O- Individual cannot complete the whole project
O- Different people have different skills
O- Specialised training
O- More experience in field
Quer criar seus próprios
Mapas Mentais
gratuitos
com a GoConqr?
Saiba mais
.
Semelhante
Random German A-level Vocab
Libby Shaw
Ecosystems
Jessica Phillips
Omissions
ameliathorn0325
ER notation
linneamd
Environmental Ethics
Jason Edwards-Suarez
The Weimar Republic, 1919-1929
shann.w
A2 Organic Chemistry - Reactions
yannycollins
GCSE Biology B2 (OCR)
Usman Rauf
AS Chemistry - Enthalpy Changes
Sarah H-V
Types and Components of Computer Systems
Jess Peason
Unit 1 flashcards
C R
Explore a Biblioteca