null
US
Entrar
Registre-se gratuitamente
Registre-se
Detectamos que o JavaScript não está habilitado no teu navegador. Habilite o Javascript para o funcionamento correto do nosso site. Por favor, leia os
Termos e Condições
para mais informações.
Próximo
Copiar e Editar
Você deve estar logado para concluir esta ação!
Inscreva-se gratuitamente
7468510
5c- Feasiblity
Descrição
A level, A2 IT (Chapter 5) Mapa Mental sobre 5c- Feasiblity, criado por Gladys Mba em 27-01-2017.
Sem etiquetas
it
ict
a2
a-level
ocr
chapter 5
it
chapter 5
a level, a2
Mapa Mental por
Gladys Mba
, atualizado more than 1 year ago
Mais
Menos
Criado por
Gladys Mba
aproximadamente 8 anos atrás
8
1
0
Resumo de Recurso
5c- Feasiblity
Financial
Cost-benefit analysis takes place to ensure best value for money
Benefits
Increased productivity per hour
Savings in running costs (e.g. ink/electricity)
Savings in staffing costs due to less staff required.
Cheaper annual software lincences
Sale of existing equipment or accomodation
Costs
Software development or purchase
Hardware purchase
Changes to accomodation
Hardware and cabling installation
Hiring of new staff (specialists)
Training costs and time lost from normal jobs
Cost of changeover period
Personnel
Intangible: Can't be measured or quantified
Disadvantages
Employees may not have expertise in new system
Redundancies due to system may decrease morale
Employees may not be willing to change work practices or adapt to new working conditions
Technical
Disadvantages
New software may require more memory, disk space and higher processing
Existing data may not be compatible with new software. Disruptions when transferring data may waste time.
New software may not be compatible with existing software
Replacing existing software may be expensive
Incompatible peripherals may need upgrading
Technology to achieve wanted solution may not exist
Development time may be long
If parallel change over can't be used there may be risks when switching systems
Feasibility report: A report addressing whether it is feasible to upgrade/install software or hardware based on many factors
Company has to weigh up all costs and benefits
Quer criar seus próprios
Mapas Mentais
gratuitos
com a GoConqr?
Saiba mais
.
Semelhante
Ecosystems
Jessica Phillips
A2 Organic Chemistry - Reactions
yannycollins
Random German A-level Vocab
Libby Shaw
ER notation
linneamd
The Weimar Republic, 1919-1929
shann.w
Computing Hardware - CPU and Memory
ollietablet123
GCSE Biology B2 (OCR)
Usman Rauf
Types and Components of Computer Systems
Jess Peason
Unit 1 flashcards
C R
Cell Structure
megan.radcliffe16
Exchange surfaces and breathing
megan.radcliffe16
Explore a Biblioteca