Bilateral Aid Case Study - Cahora Bassa Dam

Descrição

Development Gap
aedolphin
Notas por aedolphin, atualizado more than 1 year ago
aedolphin
Criado por aedolphin mais de 9 anos atrás
145
0

Resumo de Recurso

Página 1

Bilateral Aid Case Study - Cahora Bassa Dam (Mazambique) was built by the Portugese in the 1960s, but civil war prevented completion of it. However, only 1% of the homes have a direct electricity supply, and this HEP scheme has not changed this amount by very much. Most of the power is sold to South Africa, which boosts the economy but does not benefit citizens. It could meet most of the counties power needs.On the whole, the dam has increase the economy of the country, but it could produce more that is currently does. Also, it does not benefit the citizens of the country. River flow is very low because water is being held in reservoirs. The local shrimp industry has been destroyed. The local residents have has their livelihoods destroyed and they have not gained at all from the projects

Semelhante

Vocabulário de Espanhol
Debis
Guia de Redação do Vestibular
Alessandra S.
Tecnologia na Sala de aula
Alessandra S.
Vocabulário sobre o corpo em Francês
Catarina D.
GESTAO ESTRATÉGICA DE RH
Matheus Miranda
SIMULADÃO EA-HSG FATOS DA HISTÓRIA NAVAL PARTE 1
isac rodrigues
Vanguardas EUROPEIAS
Beliangel_juh
Sistema Nervoso
Marília Mendes
O Governo-Geral Brasil colônia
jacson luft
Contextualização da Aula 4 - Gestão - Administração da Carreira Profissional
Fabrícia Assunção