Maintenance personnel are broadly classified as ___ or multiskilled.
Maintenance-personnel jobs are defined by the specific job titles and numbers in the ___
___ maintenance is scheduled work required to keep equipment in peak operating condition.
A ___ order is a document that details specific maintenance task to be completed.
___ maintenance is work that is planed and scheduled for completion.
___ work is repair of a known problem before a breakdown occurs.
T or F
A plant survey can use data from the preventive maintenance system to create a master equipment file
T or F
Electronic Files are becoming more popular for storing maintenance information, as they are easy to store, organize, and access.
___ control is the organization and management of commonly used parts. vendors and suppliers, and purchasing records in the preventive maintenance system.
A(n) ___ is a book or electronic file that documents all work preformed during a shift and list information needed to complete work my maintenance technicians on other shifts.
Vibration frequency is most commonly expressed in ___.
___ is the use of temperature-indicating or -measuring devices to quantify temperature or temperature changes.
___ analysis is analysis that detects high-frequency vibration to create an image or reading.
___ principles are based on the goal of gradual, continuous improvement in all aspects of plant operations.
A(n) ___ is a sequence of operations that accomplishes desired results.
A(n) ___ is a diagram that shows a logical sequence of troubleshooting steps for a given set of conditions.
___ skills are strategies and actions that allow an individual to communicate effectively with other persons in a variety of situation.
T or F
Successful maintenance personnel practice lifelong learning.
T or F
An energy audit is a comprehensive review of a facility's energy use and a report on ways to reduce the energy use through changes to buildings, equipment, procedures.
T or F
Periodic maintenance is work completed at specific intervals to prevent breakdowns and production inefficiency.
T or F
Project work may include rebuilding or modifying equipment.
A plant ___ is a complete inventory and condition assessment of a facility's equipment and structure.
___ monitoring is unscheduled equipment monitoring as required.
Visual and ___ inspection in the analysis of the appearance and sounds of operating equipment.
___ is the change in velocity.