Cada pergunta deste Quiz é cronometrada.
A vehicle designed in compliance with Formula SAE Rules is intended for competition operation at;
A motorsports competition by a corporation you intend to ‘sell’ the design to.
Any race circuit
Any Road Show
FSAE competitions only.
An ESO is a valid team member who cannot
declare the car electrically safe
drive the car
have student status
be contacted during the event
Who requires proper training to work with High Voltage Systems in automotive vehicles?
Entire team
The electrical section of team
The ESO
ESO and ESA
Who is likely to have either an equivalent to or in particular the status of a chartered engineer?
Team Captain
ESO
ESA
The ESA reviews and signs
Cost Report
FMEA
SRCF
Design Spec Sheet
Almost all technical documents
Signature of ESA on the required documents confirms
The vehicle is fabricated by students
The vehicle design has not been copied
The vehicle has been designed with good engineering practice
The vehicle is reliable
A completely new frame evidence declares the car to be
Eligible as First Year vehicle
Eligible as Second Year vehicle
Eligible as Student-Made
Eligible as Mechanically Safe
Substantial modification from first appearance will validate the vehicle to enter as;
Second Year vehicle
First Year Vehicle
Third Year vehicle
This is not a requirement at all
Insignificant alteration to existing vehicle for entering as Second Year vehicle will undergo
Penalties for Rule Violation
Penalties for Improper Design
Penalties for Insufficient Redesign
A negative hundred points
Third Year Vehicles are required to validate
A completely new design
Nothing. No Third Year vehicles enter the competition
A completely new frame
A completely new drive system
FMEA stands for;
Finite Mode and Element Analysis
Failure Manufacturability Effect Analysis
Failure Modes and Effect Analysis
Fast Maneuver Effect Analysis
Which forms are evaluated in the order in which they are received?
ESO form
Design Spec
Business Logic
SES
What constitutes automatic withdrawal from competition, of the team?
Failure to submission of any of required documents within 10 days of the deadline
Failure to complete fabrication within time
Failure to submit two of the required technical documents within 10 days of the deadline.
Submissions will not be replaced with new uploads without penalty if submitted after " ________" date
Submission Due
No Submissions Accepted After
Final Submission
Which one of the following is one of the Technical Standards for use by Collegiate Design teams?
SAE 4130 steel
SAE 4140 steel
SAE 4310 steel
SAE grade 5 steel