Questão 1 de 40

1

Which of the following statement about composite structure diagram element are correct?

Selecione uma ou mais das seguintes:

  • Ports are modeled as small squares

  • Ports appears on the boundary of an object

  • Collaboration element is represented by a rectangle

  • Collaboration occurrences show instances of collaboration

Explicação

Questão 2 de 40

1

Which of the following statements are true about the Subsystem?

Selecione uma ou mais das seguintes:

  • Subsystems are smaller systems within a large system

  • A subsystem realizes one or more interfaces. Which define the behaviour it can perform

  • It may be represented as a UML packagcustosche or a set of operations

Explicação

Questão 3 de 40

1

Which of the following situation , aggregation may be appropriate?
1. An object is physically composed of other objects.
2. An object is logical collection of other object.
3. An object can physically contain other objects.

Selecione uma das seguintes:

  • 1,2

  • 2,3

  • 1,3

  • 1,2,3

Explicação

Questão 4 de 40

1

A_________ is represented as a task of zero duration showing an important achievement

Selecione uma das seguintes:

  • Milestone

  • Schedule

  • Project Phase

  • Tracker

Explicação

Questão 5 de 40

1

By default, MS Project 2010 accrues resource costs ______________

Selecione uma das seguintes:

  • On a prorated basis

  • At the start of the project

  • At the end of the project task

  • As soon as the specific task starts in the project

Explicação

Questão 6 de 40

1

In Ms project 2010, project managers can use the _________ field in the Resource sheet to designate resources with estimated rates or costs that update with actual rates as the project progresses

Selecione uma das seguintes:

  • Material

  • Code

  • Work

  • Resource

Explicação

Questão 7 de 40

1

By default, all tasks in MS Project are ____________

Selecione uma das seguintes:

  • Fixed units tasks

  • Fixed duration tasks

  • Fixed work tasks

Explicação

Questão 8 de 40

1

Increasing the number of resources of a task will __________ the duration and decreasing the resources will _________ the duration of the task

Selecione uma das seguintes:

  • Increase, Decreases

  • Decreases, Decreases

  • Decreases, Increase

  • Increase, Increase

Explicação

Questão 9 de 40

1

Which of the following task types MS Project dose not considered as effort – driven tasks by default?

Selecione uma ou mais das seguintes:

  • Fixed duration

  • Fixed work

  • Fixed units

  • Fixed time

Explicação

Questão 10 de 40

1

MS Project 2010 comes with a unique feature of saving a project baseline data up to _________ times during the project life cycle

Selecione uma das seguintes:

  • 6

  • 10

  • 11

  • 15

Explicação

Questão 11 de 40

1

Which of the following are elements of the custom groups?

Selecione uma ou mais das seguintes:

  • Field type

  • Field name

  • Order

  • Field group

Explicação

Questão 12 de 40

1

Which of the following leveling order delays or splits the task with the highest ID number in the project?

Selecione uma das seguintes:

  • Standard

  • ID only

  • Priority

  • Priority, Standard

Explicação

Questão 13 de 40

1

Which of the following tracking method is useful if managers want to present in their weekly status meeting. the work hours and costs put in during that week?

Selecione uma das seguintes:

  • Task-total

  • Task-time phased

  • Assignment-total

  • Assignment-timephased

Explicação

Questão 14 de 40

1

Cost performance is the difference between earned value and ____________

Selecione uma das seguintes:

  • Total value

  • Planned value

  • Actual cost

  • Project

Explicação

Questão 15 de 40

1

By default, Gantt Charts in MS Project following a _______ and________ color for the taskbars

Selecione uma ou mais das seguintes:

  • Green

  • Blue

  • Orange

  • Red

Explicação

Questão 16 de 40

1

___________ produces information reliably grounded in the observed behaviour of a system

Selecione uma das seguintes:

  • Walkthroughs

  • Verification

  • Validation

  • Testing

Explicação

Questão 17 de 40

1

________ produces value indirectly through information about valuable system behaviors.

Selecione uma das seguintes:

  • Testing

  • Walkthroughs

  • Validation

  • Verification

Explicação

Questão 18 de 40

1

Performing a test is a _________activity

Selecione uma das seguintes:

  • Physical

  • Logical

  • Technical

  • Non-technical

Explicação

Questão 19 de 40

1

Which of the statements about testing principles is true?

Selecione uma das seguintes:

  • Testing resources are limited

  • It is impossible to test everything

  • Testing is based on the design created.

  • Testing begins after the modules are integrated

Explicação

Questão 20 de 40

1

Testing is based on ___________

Selecione uma das seguintes:

  • Design team requirements

  • User requirements

  • Design outputs

  • Code developed

Explicação

Questão 21 de 40

1

Identify the measurement areas of Motorola Quality Policy for Software Development
(QPSD).

Selecione uma ou mais das seguintes:

  • Delivered defects and delivered defects per size

  • Total effectiveness throughout the process

  • Estimation accuracy

  • Decrease software defect density

Explicação

Questão 22 de 40

1

How can users enter the task information in the MS Project?

Selecione uma ou mais das seguintes:

  • Using the Gantt table

  • Importing tasks from Excel or Outlook

  • Importing tasks from Word document or project table

  • Using the Task information dialog box via the Gantt Chart view

Explicação

Questão 23 de 40

1

In which of the following situation, any two tasks can become a predecessor-successor pair?

Selecione uma ou mais das seguintes:

  • When they both auto scheduled.

  • When they have a timing relationship between them.

  • When they share resources between them.

  • One cannot Start before another finishes

Explicação

Questão 24 de 40

1

Which of the following diagram is a pictorial representation of a system’s functions? Functions from part of various processes that are executed for a system.

Selecione uma das seguintes:

  • Structured Analysis

  • Dataflow Diagram

  • Graph designing

Explicação

Questão 25 de 40

1

The project size can be measured by using the Program Complexity Method.

Selecione uma das seguintes:

  • True

  • False

Explicação

Questão 26 de 40

1

Which of the following helps us to find answers to questions related to data processing applications such as identifying the primary data object to be processed by the system, the composition of each data object and the attributes which describe the object?

Selecione uma das seguintes:

  • Data Modeling

  • System Elements

  • Data Object or Entities

Explicação

Questão 27 de 40

1

Attributes define the properties of a data object. It may serve which of the following purpose?

Selecione uma das seguintes:

  • Name an instance of the data object.

  • Describe the instance.

  • Make references to another instance in another table.

  • All of the above.

Explicação

Questão 28 de 40

1

Relationships can be bi-directional. Data object, attributes and relationships from the basic elements of data modelling and provide the basis for understanding the information domain of a problem.

Selecione uma das seguintes:

  • True

  • False

Explicação

Questão 29 de 40

1

__________ IS THE SPECIFICATION OF THE NUMBER OF OCCURRENCES OF ONE OBJECT THAT CAN BE RELATED TO NUMBER OF OCCURRENCES OF ANOTHER OBJECT.

Selecione uma das seguintes:

  • MODALITY

  • CARDINALITY

  • ENTITY

Explicação

Questão 30 de 40

1

The term __________ can be applied to a person, place ,thing ,object or event.

Selecione uma das seguintes:

  • Modality

  • Cardinality

  • Entity

Explicação

Questão 31 de 40

1

Bubbles within a Data Flow Diagram are used to represent data stores.

Selecione uma das seguintes:

  • True

  • False

Explicação

Questão 32 de 40

1

Which of the following is an organized listing of all data elements that are pertinent to the system with precise, rigorous, definitions so that both user and system analyst will have a common understanding of inputs, outputs ,components of stores and intermediate calculations?

Selecione uma das seguintes:

  • Control Flow

  • Data Dictionary

  • Cardinality

Explicação

Questão 33 de 40

1

An Entity- Relationship diagram identifies a number of components such as objects, attributes relationships and various type-indicators.

Selecione uma das seguintes:

  • True

  • False

Explicação

Questão 34 de 40

1

Which of the following defines the relationship among the major structural elements of the program?

Selecione uma das seguintes:

  • Component-level design

  • Interface design

  • Architectural design

Explicação

Questão 35 de 40

1

Which of the following describes how software communicates with system that interoperate within it and with people who use it?

Selecione uma das seguintes:

  • Component-level design

  • Interface design

  • Architectural design

Explicação

Questão 36 de 40

1

The _________ diagram is a form of activity diagram in which the nodes represent interaction diagram.

Selecione uma das seguintes:

  • Differential Overview

  • Interaction Overview

  • Partial Overview

  • Activity Overview

Explicação

Questão 37 de 40

1

The ________ diagram shows the internal structure of a class, component or collaboration, including its interaction points with other parts of the system.

Selecione uma das seguintes:

  • Complex Structure

  • Medium Internal

  • Composite Structure

  • Definition Structure

Explicação

Questão 38 de 40

1

The __________ diagram is composed only of packages and the dependencies between them

Selecione uma das seguintes:

  • Namespace

  • Activity

  • Package

  • Use-case

Explicação

Questão 39 de 40

1

Which of the following statements about the use-case model are correct?

Selecione uma ou mais das seguintes:

  • The Use-Case model only consists of actors.

  • The Use-Case model allows users to validate the fact that the system will become what they expect.

  • The Use-Case model only consist of use-cases.

  • The Use-Case model serves as a contract between customers, users, and system developers.

Explicação

Questão 40 de 40

1

Which of the following are types of project calendars in MS Project 2010?

Selecione uma ou mais das seguintes:

  • Basic Calendar

  • Standard Calendar

  • Task Calendar

  • Resource Calendar

Explicação