Which of the following show where something is located?
Specification
Method Statement
Schedule
Drawing
Which of the following shows repeated design information when fitting windows?
Programme of work
Which of the following shows when a job will be done and how long each job will take?
Which of the following will provide details of the quality of workmanship required?
What scale should be used for a detailed drawing?
1:2
1:50
1:500
1:1250
What is the symbol shown in the image?
W.C.
Sink
Bath
Window
What is the hatching shown in the image?
Blockwork
Brickwork
Earth/ subsoil
Insulation