2W151 Volume I: Administration, Management, and Publications - Quiz 4

Questão 1 de 14

1

Which inspection requires skills, equipment, and facilities beyond a normal operating unit?

Selecione uma das seguintes:

  • Scheduled

  • Phased Inspection

  • Basic scheduled Inspection

  • Programmed depot maintenance

Explicação

Questão 2 de 14

1

Which inspection is performed before resuming flying activities after the aircraft has been inactive for a specified period of time?

Selecione uma das seguintes:

  • Pre-flight

  • Post load

  • Post flight

  • End-of-runway

Explicação

Questão 3 de 14

1

What inspection is the last chance we have to ensure the installed munitions are secured, ground safety pins are removed, and impulse cartridges are installed in all applicable stations?

Selecione uma das seguintes:

  • Post load

  • Pre-flight

  • Post flight

  • End of runway

Explicação

Questão 4 de 14

1

Which inspection is a between flight inspection of aircraft or weapons system components when an immediate turnaround or a continuation flight is scheduled?

Selecione uma das seguintes:

  • Post load

  • Pre flight

  • Post flight

  • Thru flight

Explicação

Questão 5 de 14

1

Which scheduled inspection is due when the required number of flying hours, rounds fired by a gun system, or calendar time has expired?

Selecione uma das seguintes:

  • Phased Inspection

  • Periodic Inspection

  • Isochronal Inspection

  • Numerical Inspection

Explicação

Questão 6 de 14

1

Which inspection is a combination of parts of the basic post operation and/or hourly post flight and periodic inspection requirements?

Selecione uma das seguintes:

  • Isochronal inspection

  • Numerical Inspection

  • Periodic Inspection

  • Phase Inspection

Explicação

Questão 7 de 14

1

What section of the -6 technical order (TO) lists items of equipment replaced at the accrual of a specific interval of time (flying hours, equipment operating time, or calendar time) and following the occurrence of a specific condition?

Selecione uma das seguintes:

  • Replacement schedule

  • Deterioration table

  • Inspection schedule

  • Wear sensitive parts listing

Explicação

Questão 8 de 14

1

Which type of deficiency limits or prevents a material from being used for its intended purpose?

Selecione uma das seguintes:

  • Quality

  • Design

  • Material

  • Maintenance

Explicação

Questão 9 de 14

1

Which type of deficiency normally results in an excessive consumption of maintenance man-hours?

Selecione uma das seguintes:

  • Design

  • Quality

  • Material

  • Maintenance

Explicação

Questão 10 de 14

1

Which deficiency is a failure of some internal component or subassembly of a piece of equipment because of materiel stress due to pressure and/or vibration or to excessive materiel wear?

Selecione uma das seguintes:

  • Design

  • Quality

  • Material

  • Maintenance

Explicação

Questão 11 de 14

1

Which inspection will be performed after the last flight of the day or flying period, which checks the aircraft whiter it is suitable for another flight?

Selecione uma das seguintes:

  • Post flight

  • Pre flight

  • End of runway

  • Thru flight

Explicação

Questão 12 de 14

1

This inspection is to reduce the amount of time an aircraft is out of commission for any given inspection.

Selecione uma das seguintes:

  • Periodic inspection

  • Isochronal inspection

  • End of runway inspection

  • Phase inspection

Explicação

Questão 13 de 14

1

this inspection uses phased and periodic inspection concepts use flying time as the basis for scheduling and uses specified calendar intervals to build a schedule.

Selecione uma das seguintes:

  • Periodic inspection

  • Isochronal inspection

  • End of runway inspection

  • Phase inspection

Explicação

Questão 14 de 14

1

This type of deficiency is normally a deficiency caused by errors in workmanship?

Selecione uma das seguintes:

  • Quality

  • Material

  • Software

  • Design

Explicação