If a LEED project that is providing preferred parking for fuel efficient and low emitting vehicles has multiple parking lots, where should the preferred parking spaces be located?

Selecione uma das seguintes:

  • preferred parking spaces only need to be provided in one lot

  • preferred parking spaces only need to be located in the lot designated for visitors

  • preferred parking spaces only need to be provided in the lot designated for staff

  • preferred parking spaces must be distributed among all lots

Explicação

Questão 2 de 92

1

Which LEED recognized strategy will require chain of custody documentation as proof of credit compliance?

Selecione uma das seguintes:

  • certified wood

  • rapidly renewable resources

  • recycled materials

  • regional materials

  • materials reuse

Explicação

Questão 3 de 92

1

What is the greatest benefit of an integrative design process as it relates to a LEED project?

Selecione uma das seguintes:

  • educating the project owner

  • reducing project soft costs

  • meeting building codes

  • shortening the project schedule

  • capitalizing on credit synergies

Explicação

Questão 4 de 92

1

How many years can an agricultural product grow or be raised to be considered as rapidly renewable by LEED?

Selecione uma das seguintes:

  • 10

  • 15

  • 20

  • 5

Explicação

Questão 5 de 92

1

Which of the following strategies does not qualify as providing "preferred parking"?

Selecione uma das seguintes:

  • providing a space that is as close to the building as possible

  • providing a designated covered spot

  • offering a significant discount on parking passes

  • providing a guaranteed space in a lottery system

  • providing a randomly assigned parking space

Explicação

Questão 6 de 92

1

When are CFC based refrigerants allowed to be used in a LEED project?

Selecione uma das seguintes:

  • if a CFC phase out is economically infeasible

  • if the refrigerant leakage rate is below 10% annually

  • in existing buildings

  • anytime

Explicação

Questão 7 de 92

1

Which of the following is not a required design consideration for the recycling collection and storage area prerequisite?

Selecione uma das seguintes:

  • protection from the elements

  • collection truck access

  • appropriate signage

  • convenient location

Explicação

Questão 8 de 92

1

A project team is using cotton insulation that is grown and manufactured 100 miles from the project site. What credit(s) will the use of this material count toward?

Selecione uma das seguintes:

  • rapidly renewable materials

  • recycled content

  • regional materials

  • recycled content and regional materials

  • rapidly renewable materials and regional materials

Explicação

Questão 9 de 92

1

Which of the following project is considered to be a "soft cost"?

Selecione uma das seguintes:

  • the architect's fees

  • carpet

  • money paid to the brick mason for labor

  • the project's structural steel

  • landscaping costs

Explicação

Questão 10 de 92

1

What is required as documentation for each and every prerequisite and credit in the LEED for BUilding Designa nd Construction Rating System?

Selecione uma das seguintes:

  • a project drawings

  • a required signatory

  • a letter template

  • photos

  • a project narrative

Explicação

Questão 11 de 92

1

What is the minimum amount of pervious area a paving system must have to be considered "open grid"?

Selecione uma das seguintes:

  • 40%

  • 50%

  • 30%

  • 60%

  • 20%

Explicação

Questão 12 de 92

1

Solar reflectance is roughly synonymous with what term?

Selecione uma das seguintes:

  • aquifer

  • glare

  • shielding

  • albedo

  • lumen

Explicação

Questão 13 de 92

1

Which of the following is not considered to be a "basic service"?

Selecione uma das seguintes:

  • Parking lot

  • church

  • bank

  • beauty salon

  • grocery store

Explicação

Questão 14 de 92

1

One of the most cost effective ways to ensure optimal ongoing energy performance is to ______?

Selecione uma das seguintes:

  • commission building systems

  • upgrade mechanical systems

  • maintain trees and landscaping features

  • install renewable energy systems

Explicação

Questão 15 de 92

1

Which federal act has been adopted by many local jurisdictions and contains requirements for building accessibility?

Selecione uma das seguintes:

  • EPAct

  • ANSI

  • ADA

  • Civil Rights Act

  • ASHRAE

Explicação

Questão 16 de 92

1

A project generates 100 tons of waste throughout construction. 50 tons are collected off site and sent to a sorting facility with a facility wide diversion rate of 60%. 40 tons are separated on site and sent directly to recyclers. The final 10 tons are incinerated off site. What percentage of waste does LEED consider to have been recycled?

Selecione uma das seguintes:

  • 40%

  • 50%

  • 80%

  • 70%

Explicação

Questão 17 de 92

1

Which specific refrigerant has the highest global warming potential (GWP) of all the common refrigerants?

Selecione uma das seguintes:

  • HCFC-123

  • CFC-502

  • CFC-11

  • HFC-404A

  • HFC-23

Explicação

Questão 18 de 92

1

A project team is considering pursuing an innovation in design credit for a strategy that will require a large capital expense. The team decides that it will implement the strategy only if the strategy will be eligible for an innovation in design credit. What steps should the team take to determine whether its strategy will be eligible for the credit?

Selecione uma das seguintes:

  • Research existing CIRs to see whether the strategy has been previously addressed

  • Draft a compelling narrative for the LEED submittal

  • Calculate the strategy's overall environmental impact and self evaluate whether it is significant

  • Check the LEED rating system

Explicação

Questão 19 de 92

1

Which strategy supports improved indoor air quality?

Selecione uma das seguintes:

  • avoid the use of products with high carbon dioxide concentrations

  • use filters with a low minimum efficiency reporting value (MERV) rating

  • use materials with recycled content

  • design systems to deliver ample outside air

  • eliminate refrigerants with ozone depletion potential

  • use advanced framing techniques

Explicação

Questão 20 de 92

1

A new high rise residential building should use what LEED rating system for certification?

Selecione uma das seguintes:

  • LEED for New Construction

  • LEED for Homes

  • LEED for Operations and Maintenance

  • LEED for Core and Shell

  • LEED for Interior Design and Construction

Explicação

Questão 21 de 92

1

The regional priority credits for a project are based on what?

Selecione uma das seguintes:

  • The project's city

  • the project's state

  • the project's county

  • the project's zip code

Explicação

Questão 22 de 92

1

What costing model should be used to demonstrate the true cost of sustainability strategies?

Selecione uma das seguintes:

  • simple payback

  • benefit analysis

  • return on investment

  • life cycle costing

Explicação

Questão 23 de 92

1

What is the energy policy act used for in the LEED rating systems?

Selecione uma das seguintes:

  • to set indoor air quality requirements

  • to establish baseline building plumbing fixture performance

  • to establish baseline building energy performance

  • to set product VOC limits

Explicação

Questão 24 de 92

1

What is the first step in a successful waste management policy?

Selecione uma das seguintes:

  • determine the embodied energy of the product

  • specify recyclable materials

  • recycle all possible construction materials

  • reduce the total quantity of waste

  • reuse existing materials

Explicação

Questão 25 de 92

1

What is the first step a project team should consider when trying to save energy?

Selecione uma das seguintes:

  • install sub metering equipment

  • use onsite renewable energy

  • reduce energy demand

  • adopt energy efficient measures

Explicação

Questão 26 de 92

1

What happens if USBC finds out that a project does not meet the minimum program requirements (MPRs)?

Selecione uma das seguintes:

  • the project's certification level is lowered by one level

  • the project must be resubmitted

  • certification can be revoked

  • a fine must be paid

Explicação

Questão 27 de 92

1

The heat island effect may raise the temperature in an urban area by how many degrees above the temperature in nearby rural areas?

Selecione uma das seguintes:

  • 10

  • 8

  • 2

  • 6

  • 4

Explicação

Questão 28 de 92

1

What percentage of the solid waste stream each year is attributable to construction and demolition of waste?

Selecione uma das seguintes:

  • 50%

  • 20%

  • 10%

  • 40%

  • 30%

Explicação

Questão 29 de 92

1

What factor should a project team not consider when calculating life cycle costs?

Selecione uma das seguintes:

  • maintenance costs

  • operating costs

  • initial costs

  • life span

  • none of the above

Explicação

Questão 30 de 92

1

Which of the following transportation methods does not count as public transportation for LEED purposes?

Selecione uma das seguintes:

  • subway system

  • campus shuttle or school bus system

  • bus

  • elevated rail system

  • taxi

Explicação

Questão 31 de 92

1

Use of a dry urinal would decrease the fixture's water use form the Energy Policy Act baseline urinal water usage by how much?

Selecione uma das seguintes:

  • 1.6 GPF

  • 2.5 GPF

  • 0.5 GPF

  • 1.0 GPF

Explicação

Questão 32 de 92

1

LEED defined regional materials as originating within ____ miles of the project site?

Selecione uma das seguintes:

  • 500

  • 700

  • 100

  • 250

Explicação

Questão 33 de 92

1

Projects can identify which credits have regional priority by ____?

Selecione uma das seguintes:

  • Checking the USGBC website

  • researching locally pertinent environmental issues

  • calculating the net environmental impact

  • submitting a CIR

Explicação

Questão 34 de 92

1

Which type of refrigerant has an essentially zero ozone depletion potential (ODP) but still has high global warming potential (GWP)?

Selecione uma das seguintes:

  • HCFCs

  • HFCs

  • CFCs

  • natural refrigerants

Explicação

Questão 35 de 92

1

Which of the following is not a LEED accepted strategy for decreasing single rider, conventional automobile use?

Selecione uma das seguintes:

  • providing preferred parking for fuel efficient and low emitting vehicles

  • charging fees for parking

  • locating the project near mass transit

  • providing only the amount of parking required by the zoning code

  • providing bicycle storage and showers

Explicação

Questão 36 de 92

1

A building material that is made from recycled soda bottles contains _____?

Selecione uma das seguintes:

  • pre-fabricated recycled content

  • post-industrial recycled content

  • pre-consumer content

  • post-consumer recycled content

Explicação

Questão 37 de 92

1

Which LEED category has the most available LEED points?

Selecione uma das seguintes:

  • water efficiency

  • indoor environmental air quality

  • location and transportation

  • energy and atmosphere

  • sustainable sites

  • materials and resources

Explicação

Questão 38 de 92

1

Which strategy is not effective in reducing potable water use for irrigation?

Selecione uma das seguintes:

  • mulching

  • rainwater harvesting

  • drip irrigation

  • spray irrigation

  • using native or adapted plants

Explicação

Questão 39 de 92

1

What environmental problem is associated with CFC and HCFC use?

Selecione uma das seguintes:

  • soil erosion

  • ozone depletion

  • the heat island effect

  • water pollution

  • air pollution

Explicação

Questão 40 de 92

1

Which of the following strategies would not be appropriate for mitigating the heat island effect potential of the parking lot of a large office building?

Selecione uma das seguintes:

  • use paving with a SRI of 35

  • place half of the parking underground

  • use open grid paving

  • use mature trees to shade 50% of the parking lot

  • plant seedling conifers to shade the parking

Explicação

Questão 41 de 92

1

Which of the following is not a strategy for reducing stormwater runoff volume?

Selecione uma das seguintes:

  • installing a vegetated roof

  • rainwater harvesting

  • minimizing the building footprint

  • increasing impervious paving

  • using bio retention

Explicação

Questão 42 de 92

1

Which of the following types of vehicles does not qualify as an alternative fuel vehicle for the purposes of LEED?

Selecione uma das seguintes:

  • Diesel powered

  • ethanol pwered

  • hydrogen powered

  • electric powered

  • hybrid (gas-electric)

Explicação

Questão 43 de 92

1

How many of the 110 available points in most of the rating systems are considered bonus points?

Selecione uma das seguintes:

  • 10

  • 20

  • 15

  • 5

Explicação

Questão 44 de 92

1

Why should a project team aim to significantly exceed the established threshold of a LEED credit?

Selecione uma das seguintes:

  • to save the world

  • to be an overachiever

  • as a precaution against a credit being audited

  • to earn exemplary performance

Explicação

Questão 45 de 92

1

What strategy is being used for a project design that orients windows to allow the building to be warm in the winter, stay cool in the summer and capture daylight?

Selecione uma das seguintes:

  • energy simulation modeling

  • high performance mechanical systems

  • passive design concepts

  • efficiencies of scale

Explicação

Questão 46 de 92

1

Which type of system or equipment would not be a consumer of process water?

Selecione uma das seguintes:

  • dishwasher

  • cooling tower

  • domestic hot water heater

  • clothes washer

  • food steamer

Explicação

Questão 47 de 92

1

What is one potential disadvantage of using comingled recycling as a part of a construction waste management plan?

Selecione uma das seguintes:

  • It is more difficult to document than site separated recycling

  • it may be more expensive than site separated recycling

  • it takes up more site area than site separated recycling

  • it may require a greater time investment from the project team

Explicação

Questão 48 de 92

1

The CRI green label plus certification program certifies what type of building material?

Selecione uma das seguintes:

  • furniture

  • adhesives

  • wood products

  • paint

  • carpet

Explicação

Questão 49 de 92

1

Which of the following is not an acceptable form of renewable energy under the LEED rating systems?

Selecione uma das seguintes:

  • low impact hydro-electricity

  • wind turbines

  • nuclear pwoer

  • geothermal

  • photovoltaic panels

Explicação

Questão 50 de 92

1

Which type of refrigerant in general is the most efficient?

Selecione uma das seguintes:

  • HFCs

  • CFCs

  • Natural refrigerants

  • HCFCs

Explicação

Questão 51 de 92

1

Which of the following is not required of an Innovation and design strategy?

Selecione uma das seguintes:

  • it must be a strategy not already covered in the LEED rating systems

  • it must be quantifiable

  • it must be cost effective

  • it must be repeatable by other projects

  • it must be comprehensive

Explicação

Questão 52 de 92

1

Which of the following is not an approved strategy for minimizing the non-roof heat island effect?

Selecione uma das seguintes:

  • shading hardscape with photovoltaiv panels

  • placing parking underground

  • using paving materials with an SRI of 29 or higher

  • using asphalt for parking areas

  • using open grid paving

Explicação

Questão 53 de 92

1

Which rating system has a required recertification process?

Selecione uma das seguintes:

  • Operations and Maintenance

  • Homes

  • Interior Design and Construction

  • Building Design and Construction

  • Neighborhood Development

Explicação

Questão 54 de 92

1

If a project has 1 full time employee and 6 part time employees, what is the projects full time equivalent value (FTE)?

Selecione uma das seguintes:

  • 6

  • 3

  • 5

  • 7

  • 4

Explicação

Questão 55 de 92

1

What is the best use for potable water?

Selecione uma das seguintes:

  • Drinking

  • cooling towers

  • toilet flushing

  • irrigation

  • swimming pools

Explicação

Questão 56 de 92

1

What type of plant material is most appropriate for use on a green roof?

Selecione uma das seguintes:

  • annuals

  • cultivated plant species

  • native plants

  • trees and shrubs

Explicação

Questão 57 de 92

1

Which type of water is not allowed to be used for irrigation purposes?

Selecione uma das seguintes:

  • Well water

  • gray water

  • captured rain water

  • potable water

  • black water

Explicação

Questão 58 de 92

1

What is an appropriate use of the LEED logo?

Selecione uma das seguintes:

  • for a link to the website

  • by a project pursuing LEED certificaiton

  • on product packaging

  • to indicate an organization's USGBC membership

Explicação

Questão 59 de 92

1

What is not a possible source of graywater?

Selecione uma das seguintes:

  • Washing machine

  • Toilets

  • Bathroom sink

  • showers

  • drinking fountain

Explicação

Questão 60 de 92

1

What is true of the CIR process?

Selecione uma das seguintes:

  • CIRs can be submitted by anyone with a USGBC account

  • all projects must use CIRs

  • CIRs cost $220 each

  • a successful CIR can aware LEED points

Explicação

Questão 61 de 92

1

Demand controlled ventilation is typically adjusted in response to___?

Selecione uma das seguintes:

  • VOC concentrations

  • a time schedule

  • occupant requests to the building operator

  • carbon dioxide concentraions

Explicação

Questão 62 de 92

1

What sustainability concept can xeriscaping contribute to?

Selecione uma das seguintes:

  • reducing the heat island effect

  • certified wood

  • indoor air quality

  • construction waste management

  • water efficient irrigation

Explicação

Questão 63 de 92

1

Which material below is not considered a rapidly renewable resource?

Selecione uma das seguintes:

  • bamboo

  • wood

  • cork

  • silk

  • straw

Explicação

Questão 64 de 92

1

What is the best time to incorporate an integrative approach for a building project?

Selecione uma das seguintes:

  • design development

  • construction documents

  • construction

  • schematic design

  • predesign

Explicação

Questão 65 de 92

1

Which of the following regulations is likely to be contained in zoning regulations? (pick 3)

Selecione uma ou mais das seguintes:

  • landscaping regulations

  • stormwater management regulations

  • regulations on energy usage

  • open space requirements

  • parking space requirements

Explicação

Questão 66 de 92

1

Projects that achieve a projected water savings of at least ___ are eligible for an exemplary performance ID credit in addition to earning 4 points in WE indoor water use reduction.

Selecione uma das seguintes:

  • 55%

  • 40%

  • 45%

  • 50%

  • 35%

Explicação

Questão 67 de 92

1

What are some other possible LEED certifications a project may be able to receive if it has already received LEED core and shell certification? (pick 2)

Selecione uma ou mais das seguintes:

  • LEED for schools

  • LEED for new construction

  • LEED for operation and maintenance

  • LEED for Homes

  • LEED for commercial interiors

Explicação

Questão 68 de 92

1

A fuel efficient vehicle must meet which requirement to qualify as low emission and fuel efficient vehicles?

Selecione uma das seguintes:

  • green label score of 30 or more

  • green label score of 45 or more

  • green e score of 25 or more

  • green seal score of 30 or more

  • green score of 45 or more

Explicação

Questão 69 de 92

1

Which of the following products would be considered to contain post consumer recycled content that wuold contribute to the LEED credit for recycled content?

Selecione uma ou mais das seguintes:

  • plumbing pipe made from recycled plastic components

  • steel beams made from used railroad ties

  • glass tiles made from glass broken during manufacturing

  • carpet made from recycled soda bottles

  • a countertop made from newspapers

Explicação

Questão 70 de 92

1

During construction, if permanently installed air handlers are used, what is the minimum MERV rating for the filtration media needed to achieve IEQ credit: construction IAQ management plan?

Selecione uma das seguintes:

  • MERV 8

  • MERV 6

  • MERV 7

  • MERV 10

  • MERV 5

  • MERV 9

Explicação

Questão 71 de 92

1

What 3 standards can be used to achieve EA credit 1 Optimize energy performance? (pick 3)

Selecione uma ou mais das seguintes:

  • Advanced buildings benchmark

  • CBECS

  • ASHRAE 90.1-2010

  • ASHRAE 62.1-2010

  • ASHRAE advanced energy design guide

Explicação

Questão 72 de 92

1

What may prevent pedestrian access to a community resource? (pick 3)

Selecione uma ou mais das seguintes:

  • a parking lot

  • a public park

  • a freeway interchange

  • distance

  • a wall

Explicação

Questão 73 de 92

1

Which of the following materials may not contribute to construction waste management strategies? (pick 2)

Selecione uma ou mais das seguintes:

  • concrete

  • product packaging

  • scrap wood

  • asbestos floor tiles

  • land clearing debris

Explicação

Questão 74 de 92

1

What does the construction activity pollution prevention plan aim to prevent? (pick 3)

Selecione uma ou mais das seguintes:

  • carbon emissions

  • solid waste generation

  • erosion

  • airborne dust pollution

  • sedimentation

  • construction worker accidents

Explicação

Questão 75 de 92

1

Which standards are used to establish what vehicles qualify as low emitting and fuel efficient vehicles?

Selecione uma das seguintes:

  • California air resources

  • green seal standard

  • american council for an energy efficient economy green book

  • green e prodcut

  • the greenguard certification program

Explicação

Questão 76 de 92

1

The cost of LEED certification for new construction is based on which of the following?

Selecione uma das seguintes:

  • USGBC membership and project type

  • project size

  • project size and USGBC membership

  • USGBC membership

  • project size and project type

  • project type

Explicação

Questão 77 de 92

1

What is the cost of submitting a CIR?

Selecione uma das seguintes:

  • 100

  • 0

  • 220

  • 500

  • 50

Explicação

Questão 78 de 92

1

In addition to prohibiting smoking within the building, where is it also important to prohibit smoking to reduce occupant exposure to harmful airborne chemicals? (pick 2)

Selecione uma ou mais das seguintes:

  • in covered parking spaces

  • in wooded areas

  • adjacent to building air intakes

  • near building entrances

Explicação

Questão 79 de 92

1

Which of the following groups would be considered transient occupants? (pick 2)

Selecione uma ou mais das seguintes:

  • college students

  • retail customers

  • office workers

  • factory workers

  • elementary school students

Explicação

Questão 80 de 92

1

What happens after the construction submittal?

Selecione uma das seguintes:

  • the full application is ruled upon by USGBC

  • construction points are awarded

  • the design submittal

  • design and construction points are awarded

Explicação

Questão 81 de 92

1

What types of water on a residential condo project could not be used to qualify for WE credit 1 outdoor water use reduction? (pick 2)

Selecione uma ou mais das seguintes:

  • captured rainwater

  • laundry water

  • recycled waste water

  • public water, non potable

  • kitchen sink water

  • black water

Explicação

Questão 82 de 92

1

What are the two primary benefits of using regional materials? (pick 2)

Selecione uma ou mais das seguintes:

  • minimizing the impacts of transportation

  • reducing costs

  • assuring quality craftsmanship

  • supporting the local economy

Explicação

Questão 83 de 92

1

At minimum, which of the following basic materials should a recycling program designed to meet the storage and collection of recyclables prerequisite accommodate? (pick 3)

Selecione uma ou mais das seguintes:

  • glass

  • plastics

  • cardboard

  • bulbs

  • ink cartridges

Explicação

Questão 84 de 92

1

How can a project purchase green power? pick 2

Selecione uma ou mais das seguintes:

  • By purchasing green e certified RECs

  • by buying energy directly from nearby wind farm

  • through a program by the local utility company

  • by purchasing and installing solar panels

Explicação

Questão 85 de 92

1

Which of the following projects would definitely not meet minimum program requirements?

Selecione uma ou mais das seguintes:

  • 5,000 SF fire station

  • casino on a riverboat

  • a brand new elementary school

  • renovation/addition to large office building

  • temporary sports practice facility

Explicação

Questão 86 de 92

1

What two specific types of refrigerants does the Montreal Protocol phase out the use of? pick 2

Selecione uma ou mais das seguintes:

  • CFCs

  • HFCs

  • natural

  • HCFCs

Explicação

Questão 87 de 92

1

Two primary sources of potable water:

Selecione uma ou mais das seguintes:

  • private/public well

  • ocean

  • captured rainwater

  • lake or stream

  • municipal water systems

Explicação

Questão 88 de 92

1

What are some useful strategies to achieve WE credit: outdoor water use reduction? pick 3

Selecione uma ou mais das seguintes:

  • use bioswales

  • use drip irrigation

  • remove turf grass

  • implement mulching

  • create a sediment basin

Explicação

Questão 89 de 92

1

Which approaches can be taken to achieve WE credit outdoor water use reduction? pick 3

Selecione uma ou mais das seguintes:

  • avoid mulch around flower beds

  • irrigate shrubs

  • micro misters

  • irrigate with captured rain water

  • native plants

  • use only mono species

Explicação

Questão 90 de 92

1

What are ways to reduce storm water runoff volume?

Selecione uma ou mais das seguintes:

  • create retention ponds

  • impervious paving

  • slowing water run off rates

  • use high albedo roof covering

  • use smaller building footprint

  • install bioswales

Explicação

Questão 91 de 92

1

Local codes and regulations may affect which of the following strategies? pick 2

Selecione uma ou mais das seguintes:

  • purchasing green power

  • minimizing parking capacity

  • managing indoor air quality

  • construction waste management

  • use of rainwater for toilet flushing

Explicação

Questão 92 de 92

1

What is reduced when a project uses reclaimed water in its cooling towers?

Selecione uma das seguintes:

  • process water use

  • irrigation water use

  • potable water use

  • nonpotable water use

  • indoor plumbing water use

Explicação