which of the following environment is the best suited for testing an app
a. Test environment is sufficient to test before deploying the build into production environment to completely eliminate cost of having a pre-production /production environment cost
b. Any environment can be used as it may not affect the budget of project
c. Pre-production environment should be built of scalable version of actual production environment
When is the opt for tracking project made available to end user
a. during creation of project process
b. during creation of project
c. while enabling testing metric
d. bench mark updates
_______ is mockkups of an application,allowing users to visual an app that has not yet been constructed
a. prototype
b. use case
c. user type
Process package needs to be approved by?
Project Manager
b. Project Lead
c. Quality Champion
d. Quality Analysis
_____ represents sequence of actions and interactions between them?
flow
data diagram
Is it possible to view, create macro from the code options under developer tab?
Event flows does not contain exception, which could cause alternate paths through flow events?
. Risk based Quality mgmt. can assist in determining test strategy for Requirement? -
Corrective action after the defect trend will be taken by (, , , )
Test manager
Test Lead
Project Lead
Test Team member
Test scenarios have a specific case value assigned to them
To perform Function testing, the tester should have complete knowledge of the code or logic
Eligibility for project to be in C20.
Project should be Active in ESA
Project should be Active in Elm
Assurance to handle the failure, when a file is in download is done by
a. Internal l
b. External
c. Server
Test case should be
Concurrent Or
Well organized & reusable
. Check style provides checks that find class design problems, duplicate code or bug patterns like double checked locking
Three types of servers
a. Web server
b. Application server
c. Database server
. % of browsers & OS can be covered as part of testing
a. OS usage testing
b. Usage testing
c. Browser testing
d. Compatibility testing
What’s get shared
a. Requirements
b. Test plan
c. Test resources
d. Business components
. Risk based testing is done based on i.
a) test scripts based on highest risk j.
b) test scripts based on highest criticality k.
c) test scripts based on highest risk according to business needs l.
d) all
Defect trend is done by
e. a) Test Lead
f. b) Test Manager
g. c) Test Member
h. d) Project Manager
Now() displays date and time in mm/date/year format
.Document typo error is detected in which step of pareto analysis
A why1 (Lack of documentation skills)
B why 2(Lack of trained resources)
Cwhy 3 (Lack of Training)
D why 4 ( )
If defect is valid & rejected by developer then wat wi ll tester do???
A tester reopen in bug tool
B contact development mgr
C contact test mgr
Following can not be raised as a defect?
New suggestion
New comments
pareto analysis is said 80/20 for which reason??
A 80% of brainstorm caused by 20% group people
B 20% of brainstorm caused by 80% group people
web application navigation covered in
1.functional
2.accessibility
3.Interface testing
4.usability testing
Requirements errors account for ---percentage of rework
1.10
2.20
3.25
4.70 to 85
Defect report contains
1.# raised defects
2.# fixed defects
3.# reopened defects
Important Tools
Rational performance tool- source code/application
Silkperformer tool—load test conducts
Qtest—quality deploy..check for anamolies for immediate correction
HPLoad runner—check for bottlenecks in build or deploy 3 macro code ques
Spike Testing comes under:
a. Load
b. Stress
c. None
d. capacity
It is more costlier to find defects at the later stages of s/w life cycle
If a error in requirement phase is found at maintenance time it effects 100%(
Work list under Widgets
a. Allocated tasks till date
b. 3.5 months older from start date
c. 4 months older from planned date
d. ------------------
Well-developed test suite may not be required to achieve automation testing advantage