Quiz 8

Questão 1 de 25

1

The primary reason for classifying disasters as natural or man-made is:

Selecione uma das seguintes:

  • To correctly determine their probable impact

  • To correctly determine their probability of occurrence

  • To classify different types of events to better understand them

  • To determine which contingency plans need to be carried out

Explicação

Questão 2 de 25

1

For the purpose of business continuity and disaster recovery planning, the definition of a “disaster” is:

Selecione uma das seguintes:

  • Any event that impairs the ability for an organization to continue operating

  • Any natural event that impairs the ability for an organization to continue operating

  • Any man-made event that impairs the ability for an organization to continue operating

  • Any event that impairs the ability for an organization’s IT systems to continue operating

Explicação

Questão 3 de 25

1

The primary impact of a pandemic on an organization is:

Selecione uma das seguintes:

  • Significant disruptions of public utilities

  • Significant disruptions of transportation systems

  • Large numbers of casualties that reduce the demand for services

  • Long periods of employee absenteeism that impact the organization’s ability to provide services

Explicação

Questão 4 de 25

1

The activity that is concerned with the continuation of business operations is:

Selecione uma das seguintes:

  • Emergency Response Procedures

  • Disaster Recovery Planning

  • Business Continuity Planning

  • Business Impact Analysis

Explicação

Questão 5 de 25

1

The main reason that a DRP project should have executive support and approval is:

Selecione uma das seguintes:

  • A DRP project is very expensive

  • A DRP project requires significant adjustments in the allocation of resources

  • A DRP project requires the redesign of all in-scope IT systems

  • A DRP project requires the redesign of all in-scope business processes

Explicação

Questão 6 de 25

1

An organization is about to start its first disaster recovery planning project. The project manager is responsible for choosing project team members. Which staff members should be chosen for this project?

Selecione uma das seguintes:

  • The project should use outsourced technical experts

  • The least experienced team members

  • The most experienced team members

  • The project should use outsourced disaster recovery planning experts

Explicação

Questão 7 de 25

1

At the beginning of a disaster recovery planning project, the project team will be compiling a list of all of the organization’s most important business processes. This phase of the project is known as:

Selecione uma das seguintes:

  • Business Impact Analysis

  • Risk Analysis

  • Business Process Analysis

  • Determination of maximum tolerable downtime (MTD)

Explicação

Questão 8 de 25

1

In what sequence should a disaster recovery planning project be performed?

Selecione uma das seguintes:

  • Business Impact Analysis, Maximum Tolerable Downtime, Recovery Point Objective, Recovery Time Objective, training, testing

  • Survey business processes, threat and risk analysis, develop recovery targets, criticality analysis

  • Project plan, risk assessment, statements of impact, criticality analysis, recovery targets, test recovery plans

  • Project plan, Business Impact Analysis, develop recovery plans, train personnel, test recovery plans

Explicação

Questão 9 de 25

1

Benefits from disaster recovery and business continuity planning include all of the following EXCEPT:

Selecione uma das seguintes:

  • Improved system resilience

  • Process improvements

  • Improved market advantage

  • Improved performance

Explicação

Questão 10 de 25

1

The types of BCP and DRP tests are:

Selecione uma das seguintes:

  • Document review, walkthrough, parallel test, cutover test

  • Document review, walkthrough, simulation, parallel test, cutover test

  • Document review, walkthrough, sanity test, parallel test, cutover test

  • Walkthrough, simulation, parallel test, cutover test, live test

Explicação

Questão 11 de 25

1

The purpose of a cutover test is:

Selecione uma das seguintes:

  • To determine the ability to perform live business transactions on production systems instead of on backup systems

  • To determine the ability for a recovery test to be interrupted

  • To determine the ability to perform live business transactions on production systems and backup systems at the same time

  • To determine the ability for the last minute substitution of a recovery team

Explicação

Questão 12 de 25

1

The purpose of a parallel test is:

Selecione uma das seguintes:

  • To determine the ability to perform live business transactions on production systems instead of on backup systems

  • To determine the ability for a recovery test to be interrupted

  • To determine the ability to perform live business transactions on production systems and backup systems at the same time

  • To determine the ability for the last minute substitution of a recovery team

Explicação

Questão 13 de 25

1

The greatest risk related to a cutover test is:

Selecione uma das seguintes:

  • If backup servers do not function correctly, the test will fail

  • A cutover test tests only the live load and not the switchover

  • A cutover test tests only the switchover and not the live load

  • If backup servers do not function correctly, critical business processes may fail

Explicação

Questão 14 de 25

1

A project team has just completed building the organization’s business continuity plan. Which of the following tests should be performed first?

Selecione uma das seguintes:

  • Walkthrough

  • Simulation

  • Parallel test

  • Cutover test

Explicação

Questão 15 de 25

1

An organization that is building a disaster recovery capability needs to re-engineer its application servers to meet new recovery requirements of 4 hour RPO and 24 hour RTO. Which of the following approaches will best meet this objective?

Selecione uma das seguintes:

  • Active/Passive server cluster with replication

  • Tape backup and restore to a hot site

  • Tape backup and restore to a cold site

  • Server cluster with shared storage

Explicação

Questão 16 de 25

1

The purpose of a server cluster includes all of the following EXCEPT:

Selecione uma das seguintes:

  • Improve an application’s availability

  • Increase an application’s capacity

  • Increase an application’s data storage

  • Provide fault tolerance

Explicação

Questão 17 de 25

1

The purpose of off-site media storage is:

Selecione uma das seguintes:

  • To protect media from damage in the event of a disaster

  • To protect media from theft

  • To provide additional storage not available on-site

  • To meet regulatory requirements for media protection

Explicação

Questão 18 de 25

1

An organization that is performing a disaster recovery planning project has determined that it needs to have on-site electric power available for as long as ten days, in the event of an electric utility failure. The best approach for this requirement is:

Selecione uma das seguintes:

  • Uninterruptible power supply (UPS) and power distribution unit (PDU)

  • Electric generator

  • Uninterruptible power supply (UPS)

  • Uninterruptible power supply (UPS) and electric generator

Explicação

Questão 19 de 25

1

The first priority for disaster response should be:

Selecione uma das seguintes:

  • Backup media

  • Paper records

  • Personnel safety

  • Remote access

Explicação

Questão 20 de 25

1

Which of the following would NOT be on a list of parties to notify in the event of a disaster-related emergency:

Selecione uma das seguintes:

  • Civil authorities

  • Utilities

  • Shareholders

  • Customers

Explicação

Questão 21 de 25

1

Why is disaster recovery-related training a vital component in a DRP project?

Selecione uma das seguintes:

  • The plan will be able to be certified

  • Recovery is performed by outside organizations

  • The personnel who are most familiar with systems may be unavailable during a disaster

  • Personnel may be unfamiliar with recovery procedures

Explicação

Questão 22 de 25

1

Why is it important to understand the cost of downtime of critical business processes?

Selecione uma das seguintes:

  • Management will be able to make decisions about the cost of mitigating controls and contingency plans

  • Management will be able to determine which processes are the most critical

  • Management will be able to establish a training budget

  • Management will be able to compare recovery costs with those in similar organizations

Explicação

Questão 23 de 25

1

The definition of Recovery Point Objective (RPO) is:

Selecione uma das seguintes:

  • The location of the recovery site

  • The maximum amount of downtime

  • The method used to recover backup data

  • The maximum amount of data loss

Explicação

Questão 24 de 25

1

The definition of Recovery Time Objective (RTO) is:

Selecione uma das seguintes:

  • The location of the recovery site

  • The maximum amount of downtime

  • The method used to recover backup data

  • The maximum amount of data loss

Explicação

Questão 25 de 25

1

A DRP project team has determined that the RTO for a specific application shall be set to 180 minutes. Which option for a recovery system will best meet the application’s recovery needs?

Selecione uma das seguintes:

  • Hot standby systems and tape recovery

  • Server clustering and data replication

  • Warm standby systems and tape recovery

  • Cold site and tape recovery

Explicação