Central Heating Exam 2

Descrição

Construction / Engineering Quiz sobre Central Heating Exam 2, criado por Jarmo Tossavainen em 09-05-2018.
Jarmo Tossavainen
Quiz por Jarmo Tossavainen, atualizado more than 1 year ago
Jarmo Tossavainen
Criado por Jarmo Tossavainen aproximadamente 6 anos atrás
402
1

Resumo de Recurso

Questão 1

Questão
1/ Which part of the Building Regulations deals with the energy efficient installation of central heating systems in domestic properties?
Responda
  • a) Part G
  • b) Part L1
  • c) Part L2
  • d) Part M

Questão 2

Questão
2/ Details of the heat output requirement for a particular radiator can be found in which of the following documents?
Responda
  • a) British Standards
  • b) Water Regulations
  • c) Building Regulations
  • d) Manufacturer’s brochure

Questão 3

Questão
3/ What is the likely outcome of rigidly fixing central heating pipework to the notched sections in timber first floor joists?
Responda
  • a) Rupture of the pipework
  • b) A reduction in energy efficiency
  • c) Corrosion of the pipework
  • d) Expansion and contraction noise

Questão 4

Questão
4/ The main disadvantage of using a one pipe circuit to the radiators in a central heating system is that –
Responda
  • a) The last radiator on the circuit will be fed with water at a lower temperature than the first
  • b) The first radiator on the circuit will be fed with water at a lower temperature than the last
  • c) Pipework feeding all radiators must be 22mm in diameter
  • d) The circuit cannot be pumped, gravity circulation must be used

Questão 5

Questão
5/ Which fully pumped central heating system control component is missing from ` the following diagram?
Responda
  • a) Pump
  • b) Cylinder thermostat
  • c) Room thermostat
  • d) Mid-position valve

Questão 6

Questão
6/ What is the minimum size of open vent pipe to a fully pumped central heating system in a small domestic property?
Responda
  • a) 10mm
  • b) 15mm
  • c) 22mm
  • d) 28mm

Questão 7

Questão
7/ Which one of the following additional components will require to be installed when replacing a single feed indirect cylinder with a double feed indirect cylinder?
Responda
  • a) Frost thermostat
  • b) Feed and expansion cistern
  • c) Cold water storage cistern
  • d) Automatic bypass valve

Questão 8

Questão
What would be the main effect on the central heating system if the circulator was installed in the position shown in this diagram?
Responda
  • a. The system would be under negative pressure
  • b. The system would be mostly under negative pressure
  • c. The system would be pumping over the open vent
  • d. The neutral position would be at the base of the open vent.

Questão 9

Questão
The feed and expansion cistern in an open vented central heating system should be capable of receiving what percentage volume of water from the heating system when heated –
Responda
  • a) 2%
  • b) 4%
  • c) 8%
  • d) 16%

Questão 10

Questão
The recommended vertical height from floor level to the position of a room thermostat is –
Responda
  • a) 1.0m
  • b) 1.5m
  • c) 2.0m
  • d) 2.5m

Questão 11

Questão
Which air separator port in the following diagram is the flow pipe from the boiler connected to?
Responda
  • a) Port 1
  • b) Port 2
  • c) Port 3
  • d) Port 4

Questão 12

Questão
Which of the following statements is correct in relation to the installation of thermostatic radiator valves?
Responda
  • a) Thermostatic radiator valves may only be fitted to ground floor radiators in a property
  • b) Thermostatic radiator valves may only be fitted to first floor radiators in a property
  • c) All radiators in a property should be fitted with thermostatic radiator valves
  • d) At least one radiator in a property should be fitted without a thermostatic radiator valve

Questão 13

Questão
Which pipe connects to the AB port of the mid-position valve in the following diagram?
Responda
  • a) Open vent pipe
  • b) Flow pipe to the cylinder
  • c) Return pipe from the cylinder
  • d) Flow pipe from the pump

Questão 14

Questão
Which of the following components is fitted at the high points in pipework in central heating systems?
Responda
  • a) Automatic air vent
  • b) Non-return valve
  • c) Automatic bypass valve
  • d) Drain valve

Questão 15

Questão
Central heating systems with metallic pipework materials are normally soundness tested to what test pressure?
Responda
  • a) 0.5 times the maximum operating pressure
  • b) The maximum operating pressure
  • c) 1.5 times the maximum operating pressure
  • d) Twice the maximum operating pressure

Questão 16

Questão
Which of the following is part of the commissioning procedure for a new central heating system?
Responda
  • a) Hot flushing to assist with flux removal
  • b) Disinfecting the system with chlorine
  • c) Removing the feed & expansion cistern during filling
  • d) Lubricating the circulating pump with oil

Questão 17

Questão
When replacing a radiator and its associated valves sited on the first floor of a property which is the most efficient way of draining the water to undertake the work?
Responda
  • a) Turn off the valves and drain down the radiator
  • b) Completely drain the whole system
  • c) Drain the system to below the first floor
  • d) Isolate the cistern and empty its contents

Questão 18

Questão
The safest method of ensuring that the electrical controls in a central heating system cannot be re-activated during temporary decommissioning work is to –
Responda
  • a) Isolate the system from the supply at the consumer unit and get on with the work
  • b) Switch off the supply to the system at the fused spur, retain the fuse and check for safe isolation
  • c) Switch off the supply to the system at the fused spur and check for safe isolation
  • d) Switch off the fused spur remove the wires from its outlet and tape up the ends

Questão 19

Questão
What is the likely problem arising from a bypass not being fitted to an open vented close-coupled fully pumped heating system controlled by 2 x two port valves on the heating and hot water circuits?
Responda
  • a) ‘Sucking down’ and ‘pumping over’ the open vent pipe
  • b) Blockage occurring in the cold feed pipe
  • c) Rapid pinhole corrosion of the radiators
  • d) No cool water from the f & e cistern if the system overheats

Questão 20

Questão
Which of the following central heating components may contain a replaceable packing gland?
Responda
  • a) Circulating pump
  • b) Automatic air vent
  • c) Thermostatic radiator valve
  • d) Room thermostat

Semelhante

Glossário de Português
Alessandra S.
Função Polinomial do 1º Grau
KauanM
QUESTIONÁRIO DE INFORMÁTICA: SISTEMAS OPERACIONAIS
anapaulabrasilam
Espécies de Agente Público
Gik
GEOMETRIA ESPACIAL
Larissa Teixeira
7 Tendências Educacionais
GoConqr suporte .
PROTAGONISMO DO ALUNO
Alessandra S.
Conceitos Básicos - Genética
João Martins
Metodologias Ativas
Jussara Seidel
Liderança Militar - Exercício 2
Ibsen Rodrigues Maciel
ÁTOMO
Hugo Fonseca