Second (ADSE I) [Quiz]

Descrição

Hell Aqib Quiz sobre Second (ADSE I) [Quiz], criado por Muhammad Aqib em 19-06-2019.
Muhammad Aqib
Quiz por Muhammad Aqib, atualizado more than 1 year ago
Muhammad Aqib
Criado por Muhammad Aqib mais de 5 anos atrás
170
0

Resumo de Recurso

Questão 1

Questão
Defects are less costly if detected in which of the following phases
Responda
  • Coding
  • Design
  • Requirements Gathering
  • Implementation

Questão 2

Questão
User Acceptance testing is
Responda
  • White box testing
  • Black box testing
  • Gray box testing
  • None of the above

Questão 3

Questão
Error guessing is a
Responda
  • Test verification techniques
  • Test execution techniques
  • Test control management techniques
  • Test data management technique

Questão 4

Questão
Histogram refers to
Responda
  • Bar chart
  • Run chart
  • Pareto diagram
  • Correlation diagram

Questão 5

Questão
Pareto principle advocates
Responda
  • 20-80 rule
  • 80-20 rule
  • 40-60 rule
  • 60-40 rule

Questão 6

Questão
Which one is not Structural Testing?
Responda
  • Regression
  • Parallel
  • Acceptance
  • Stress

Questão 7

Questão
Testing comes under which category of cost of quality?
Responda
  • Preventive
  • Appraisal
  • Failure
  • None of the above

Questão 8

Questão
Which of the following is not true about Incremental testing?
Responda
  • Top-Down approach can be used
  • Use of stubs or drivers are required
  • All modules need to be completed prior to testing
  • Bottom – up approach is also possible

Questão 9

Questão
Which of the following is not a part of test plan?
Responda
  • Scope
  • Mission
  • Objective
  • Risk

Questão 10

Questão
Which one is not Statistical Tool?
Responda
  • Cause and effect Graphing
  • Stratification
  • Run Chart
  • Regression Analysis

Questão 11

Questão
The ‘v’ represent the following term:
Responda
  • Verification and validation
  • Static testing and Dynamic testing
  • Black box testing and white box testing
  • Software development process and software testing process

Questão 12

Questão
Function point is a measure of
Responda
  • Effort
  • Complexity
  • Usability
  • Size

Questão 13

Questão
You are told to prepare a report on the most commonly occurring product defects. You review the software defect reports, which categories the defects of coding errors, requirement errors, documentation errors, etc. The best tool to report this information is
Responda
  • A histogram
  • A pareto diagram
  • A cause and effect diagram
  • A scatter plot

Questão 14

Questão
A statistical technique to assess, monitor and maintain the stability of a process is
Responda
  • Pareto chart
  • Control chart
  • Run chart
  • Histogram

Questão 15

Questão
The two types of incremental testing approaches are top down and bottom up approach.
Responda
  • True
  • False

Questão 16

Questão
If the measurement taken by the two people are same refers to the terms as
Responda
  • Reliability
  • Validity
  • Calibration
  • Ease of use and simplicity

Questão 17

Questão
Test Readiness review is conducted by the
Responda
  • Project manager
  • Test manager
  • Quality assurance personnel
  • User/Customer

Questão 18

Questão
To which phase will training cost fall?
Responda
  • Failure
  • Prevention
  • Build
  • Appraisal

Questão 19

Questão
You are performing a test to see that it complies with the user requirement that a certain field be populated by using a drop down box containing a list of values. What kind of testing are you doing?
Responda
  • White box testing
  • Black box testing
  • Load testing
  • Regression testing

Questão 20

Questão
Which is the reputed testing standard?
Responda
  • M Bridge awards
  • QAI
  • ISO
  • Microsoft

Semelhante

Important (ADSE I)
Muhammad Aqib
First (ADSE I) [Quiz 3]
Muhammad Aqib
First (ADSE I) [Quiz 1]
Muhammad Aqib
GRAMATICA
santosfilipe123
História da informática
Renato Costa
Música
Philosophus Rex
LEI 8112/1990
eldersilva.10
TICs na Matemática
Erika Lopes
Grupos de GoConqr - Guia do usuário
GoConqr suporte .
Técnicas de Estudo
vivi sousa
SIMULADÃO EA-HSG OGSA – ORDENANÇA GERAL DOS SERVIÇOS DA ARMADA
Vyvian Barbosa